Bishop’s College School – Sports Center

01
Description

Comprehensive energy efficiency project aimed at reducing energy consumption and GHG emissions while renewing assets and improving air quality and user comfort. The project consisted of implementing several energy efficiency measures including converting the high-temperature heating network to low temperature, replacing atmospheric boilers with condensing boilers, installing a thermal wheel on the fresh air unit and replacing old ventilation units operating on R22 with new units with thermal wheels and modulating compressors.

Projet ORT BISHOP-SPORT CENTER.
02
Fields of intervention
  • Energy Audit
  • Design, plans and specifications
  • Financial support
  • Commissioning
03
Impact and results
  • 60% reduction in energy consumption
  • Improving air quality and user comfort by increasing the quantity of fresh air
  • Renewal of mechanical equipment
  • Obtaining financial support to make the implementation of energy efficiency measures profitable