For a commercial, institutional or industrial building, the Hydro-Québec bill depends not only on the kilowatt-hours consumed: the power demand, especially in winter, weighs heavily and can remain billed for twelve months. Understanding Rates G, M and LG, the concept of minimum billing demand and the demand response options makes it possible to decide where to act before the next winter period.

Information verified in October 2026 with Hydro-Québec (the document Electricity Rates effective April 1, 2026 and the business pages) and the Régie de l’énergie (in French). Rates are revised every April 1: always check the version in effect.

Which rates have applied since April 1, 2026?

Since April 1, 2026, Hydro-Québec’s general rates have increased by 3.8% on average, according to the schedule approved by the Régie de l’énergie (Québec’s energy regulator). The exact amounts appear in the Electricity Rates document effective April 1, 2026, established in accordance with Schedule 1 of the Hydro-Québec Act.

The Régie de l’énergie decisions

The Régie’s decision D-2026-033, dated March 13, 2026 and announced by press release on March 16, 2026, concerns Hydro-Québec’s rate application for 2026, 2027 and 2028. In its decision D-2026-036, it definitively set the price components applicable on April 1, 2026: according to the Régie’s April 7, 2026 press release, the increases that took effect were 3% on average for domestic rates and 3.8% for general rates and large-power industrial rates. Decision D-2026-038 sets April 1, 2026 as the effective date of the text of the Rates. The 2027 and 2028 increases had been approved on a provisional basis only.

Note that the 3% cap set by Order in Council 1239-2025 applies to certain domestic rates. Business rates are not subject to this cap.

Who are Rates G, M and LG for?

The applicable rate depends on the power demand of the contract: Rate G is for small power, Rate M for medium power and Rate LG for large power (5,000 kW and above) that is not industrial. Rate L, for its part, is for large power principally related to an industrial activity.

RateCustomers covered (2026 Electricity Rates text)
G (small power)Contract whose minimum billing demand is less than 65 kW. The first 50 kW of demand are not billed.
M (medium power)Contract whose maximum power demand was at least 50 kW during one of the last 12 monthly periods, and whose minimum billing demand is less than 5,000 kW.
G9Low-load-factor contract whose maximum power demand reached at least 65 kW during the last 12 monthly periods.
LG (large power)Annual contract whose minimum billing demand is at least 5,000 kW, excluding contracts principally related to an industrial activity.
L (industrial large power)Annual contract whose minimum billing demand is at least 5,000 kW and which is principally related to an industrial activity.

Changes from one rate to another are regulated. When the minimum billing demand of a Rate G contract reaches 65 kW, it moves to Rate M or, if its average load factor over the last 12 periods is below 26%, to Rate G9. Since the minimum billing demand is 65% of the winter peak (see below), this threshold is reached as soon as a winter peak of 100 kW is recorded. Likewise, a Rate M contract whose minimum billing demand reaches 5,000 kW moves to Rate L, if it is eligible, or to Rate LG.

The Rates text (art. 3.7) also provides, for Rate G, an increase in the second-tier energy price taking effect every April 1 and designed to eliminate degressivity; on April 1, 2026, this second tier increased by 3.8%, like the other components of the rate. Every April 1, Hydro-Québec automatically replaces Rate G with Rate M or G9 if that change would have saved the customer at least 3% over the previous 12 periods. The customer may, once only, choose another eligible rate within the following 3 monthly periods.

How is a Rate G bill calculated?

Under Rate G, the monthly bill combines a system access charge, a demand charge on kilowatts above 50 kW and a two-tier energy price. The system access charge has replaced, since April 1, 2019, what Hydro-Québec used to call the subscription charge.

Rate G component (annual contract)Price on April 1, 2026
System access charge$15.426 per month
Demand charge, above 50 kW$22.071 per kW
Energy, first 15,090 kWh of the month12.388¢ per kWh
Energy, remaining consumption9.534¢ per kWh
Minimum monthly bill$15.426 (single-phase) or $46.278 (three-phase)

For a Rate G contract, Hydro-Québec installs a maximum-demand meter when the installation is likely to exceed 50 kW. Below that threshold, no demand is billed.

How are Rates M and LG calculated?

Under Rate M, all of the billing demand is charged from the first kilowatt, in addition to energy billed in two tiers; there is no system access charge, but there is a minimum monthly bill. Under Rate LG, the structure is simpler: a demand charge and a single energy price.

ComponentRate MRate LG
Demand charge$18.242 per kW of billing demand$16.571 per kW of billing demand
Energy6.292¢ per kWh for the first 210,000 kWh, then 4.666¢ per kWh4.324¢ per kWh
Minimum billing demand65% of the winter peak of the last 12 periods75% of the winter peak of the last 12 periods, but not less than 5,000 kW
Minimum monthly bill$15.426 (single-phase) or $46.278 (three-phase)Not applicable

Rate LG also includes a charge for unused available power: if the highest real power demand of the last 12 periods is below 60% of the available power, the difference between that highest demand and 60% of the available power is subject to a charge of $38.502 per kW. Under Rates G, M and LG, a credit for supply applies when electricity is delivered at medium or high voltage and the customer uses it at that voltage or transforms it themselves (for example $1.1427 per kW per month for a voltage of 15 kV to less than 50 kV).

For short-term contracts under Rates G and M, the monthly demand charge is increased by $7.542 per kW in the winter period.

Billing demand, minimum billing demand and the ratchet effect

Billing demand is equal to the maximum power demand during the consumption period, but is never less than the minimum billing demand, which is set from the winter peak of the last 12 monthly periods. This mechanism, often called the “ratchet effect,” is why a single winter peak can carry over onto the bills for the following 12 months.

How maximum power demand is measured

According to the Rates, maximum power demand is the higher of the following two values, measured over 15-minute integration periods:

  • the highest real power demand, in kilowatts;
  • 90% of the highest apparent power demand, in kilovoltamperes, for small- or medium-power contracts (95% for large power).

In other words, a single 15-minute power demand is enough to set the month’s demand. And when 90% of the highest apparent power demand exceeds the highest real power demand (which happens notably when the power factor, the ratio of real power to apparent power, is below 90%, or 95% for large power), that weighted value becomes the maximum power demand. If the customer installs capacitors, synchronous motors or synchronous condensers that durably improve this ratio, Hydro-Québec may, at the customer’s request, adjust the minimum billing demand accordingly.

The role of the winter period

Under Rates G and M, the minimum billing demand for each period is 65% of the maximum power demand during a consumption period falling wholly within the winter period (December 1 to March 31), among the 12 monthly periods that precede. This percentage is 75% under Rates G9 and LG. Under Rate L, the minimum is instead a contract power chosen by the customer.

In practical terms, a one-off peak in January (simultaneous equipment start-up, heating restart after an outage, a test of a grid-connected generator, etc.) can therefore set a billed-demand floor until the following winter, even if the building never draws that power again in summer.

What demand response options are available for winter 2026-2027?

For winter 2026-2027, Hydro-Québec offers business customers two demand response (DR) options: the Demand Response – Leeway Option (DR Leeway Option, called “GDP Latitude” in French) and the Demand Response – Commitment Option (DR Commitment Option, “GDP Engagement”). They replace the former GDP Affaires option and the interruptible electricity option, as part of an overhaul whose rate structure the Régie de l’énergie approved (decision D-2025-037 of March 14, 2025). Both options pay a credit in exchange for reductions in power demand during peak demand events, between December 1 and March 31.

A note on deadlines: the Rates text sets the sign-up deadline at September 30 for the Leeway Option (the information must be provided by September 30 at the latest) and the application must be submitted before September 30 for the Commitment Option. For winter 2026-2027, that deadline has passed. The Leeway Option does, however, allow an exceptional mid-winter sign-up, with a reduced credit (see below). Customers enrolled in the former DR option on April 1, 2026 were automatically transferred to the Leeway Option, with a 40-hour sub-option.

DR Leeway Option (GDP Latitude)

The DR Leeway Option is for contracts under Rates DM, DP, G, H, M, G9 and LG, as well as Rate L when the power demand during the 12 periods preceding sign-up is below 50,000 kW. It requires a communicating meter. Its main terms:

  • peak demand events of 3 to 4 hours, between 6 a.m. and 9 a.m. or between 4 p.m. and 8 p.m., at most 2 per day, with a minimum of 7 hours between two events;
  • choice of a maximum duration per winter: 20, 40, 60, 80 or 100 hours (sub-options I to V), and optional weekend participation (sub-option WE);
  • notice no later than 3 p.m. on the preceding business day for a morning event, and no later than noon on the same day for an evening event;
  • credit per kilowatt of weekday effective interruptible power: $44.638 (20 h), $74.743 (40 h), $85.124 (60 h), $92.391 (80 h) and $99.658 (100 h); on weekends, $1.879 per kW for a 3-hour interruption and $2.512 per kW for 4 hours;
  • no credit if the effective interruptible power is below 10 kW, and Hydro-Québec may refuse to pay the credit if no reduction is observed during more than half of the weekday events.

Effective interruptible power is calculated after the winter, by comparison with a reference power estimated by regression on the contract’s usual profile and the temperature. A mid-winter sign-up is possible on an exceptional basis, but the credit is reduced by 25% (December), 50% (January), 75% (February) or 100% (March). If no weekday event is called during the winter, Hydro-Québec pays a credit equal to the lesser of 15% of the maximum power demand multiplied by $74.890 per kW, or $22,693.696.

DR Commitment Option (GDP Engagement)

The DR Commitment Option is for customers under Rates G, M, L or LG that can commit to interrupting a specified amount of power. Hydro-Québec presents it as intended for experienced customers and recommends that new participants start with the Leeway Option. Its main terms:

  • load factor above 60% over the 12 periods preceding sign-up, and interruptible power of at least 10 kW;
  • 20 sub-options combining a maximum duration of 20 to 100 hours per winter, 1 or 2 events per day and participation or not on weekends; each event lasts 4 to 5 hours;
  • fixed credit of $51.905 to $75.781 per kW of effective interruptible power depending on the sub-option, plus a variable credit of 5.191¢ or 36.334¢ per kWh for each event hour;
  • a 5% bonus on the fixed credit for a two-winter commitment and 10% for three winters, with a premium in case of breach;
  • charges for overruns during an event: $1.568 per kW for the first missed event and $4.474 per kW for subsequent ones, up to 150% of the winter’s fixed credit.

The Leeway and Commitment options cannot be combined. Hydro-Québec may also limit the total amount of power accepted according to its network needs.

Dynamic rates Flex M and Flex G

Businesses that prefer a price signal to a credit can consider a dynamic rate. Rate Flex M, an experimental rate for medium power, remains available for winter 2026-2027: sign-up must be done before November 20, and the rate applies no later than December 1. In winter, energy costs 3.966¢ per kWh outside peak demand events and 62.558¢ per kWh during events (weekdays, 6 a.m. to 9 a.m. and 4 p.m. to 8 p.m., at most 100 hours per winter), with the same demand charge as Rate M. Rate Flex G, reserved for contracts whose maximum power demand is below 50 kW, applies 10.173¢ per kWh outside events and 56.516¢ per kWh during events, at most 120 hours per winter. These rates cannot be combined with the DR options.

What about the Winter Credit Option?

The Winter Credit Option for Rate G customers has not been available to new contracts since March 31, 2026. Contracts enrolled in it on that date can continue to benefit from it; the credit is 62.558¢ per kilowatt-hour avoided.

Financial support to automate participation

Hydro-Québec offers financial support, under its Solutions efficaces program (its energy efficiency solutions program for businesses), for installing or enhancing a building management system intended to automate demand response (adding control points, programming sequences). The business must be enrolled in the Leeway or Commitment option, in a sub-option of at least 40 hours per winter and at most 2 events per day, for 5 years following the grant of the support.

What technical levers can reduce the peak?

Reducing the peak means preventing several large loads from running at the same time during the busiest 15-minute intervals of winter, without compromising comfort or production. The actual gain depends on each building’s profile; it is demonstrated from power data, not from generic ratios.

1. Start with the power profile

Interval consumption data make it possible to identify the days, hours and equipment that set the winter peak. A power-focused energy audit or energy assessment links these peaks to the loads involved: electric heating, ventilation, process cooling, vehicle charging, compressors, etc.

2. Load shedding and sequencing

Load shedding consists of temporarily cutting or modulating non-critical loads during at-risk periods or during a peak demand event. Sequencing, for its part, staggers equipment start-up (morning heating restart zone by zone, staggered motor starts, vehicle charging setpoints) to avoid overlap. These strategies are programmed in the building management system and must be validated during commissioning, then reviewed as part of a recommissioning.

3. Thermal storage and building inertia

Thermal storage (heat accumulators, hot or chilled water tanks) and preheating the building before peak hours shift demand to less busy hours. Their sizing should rely on an energy model and on the event hours provided for by the chosen rate option.

4. Dual-energy

A dual-energy system uses electricity as the main heating source and a fuel as backup when it is very cold. Hydro-Québec offers a small- and medium-power dual-energy rate for space heating, with an automatic switchover device controlled by a sensor supplied by Hydro-Québec: fuel mode is used below −12 °C or −15 °C depending on the climate zone. This rate cannot be combined with the DR options. See also our article on dual-energy in commercial buildings.

5. Power factor correction

When billing demand is determined by 90% of apparent power, power factor correction (capacitors, compensators) directly reduces billing demand. Article 12.5 of the Rates also provides for an adjustment of the minimum billing demand when the improvement is significant and permanent.

These levers are best placed within a structured monitoring approach, such as an ISO 50001 energy management system, so that power gains are measured and maintained from one winter to the next.

How ORT Énergie can support you

ORT Énergie is an energy efficiency consulting engineering firm. In peak management, our team can:

  • analyze the power profile of your contracts and identify the loads that set the minimum billing demand;
  • carry out the energy audit, modelling and recommissioning needed to define load shedding, sequencing or thermal storage strategies;
  • design the plans and specifications for the selected measures and take part in their commissioning;
  • support you with your financial assistance applications and with implementing an ISO 50001 energy management system.

Choosing a rate option and a level of commitment remain business decisions: our role is to give you a solid technical basis for making them. Contact us to discuss it.

Frequently asked questions (FAQ)

What is the difference between Hydro-Québec’s Rate G and Rate M?

Rate G applies to small power, when the minimum billing demand is below 65 kW; only demand above 50 kW is billed, at $22.071 per kW on April 1, 2026. Rate M is for medium power: it is available when the maximum power demand has reached at least 50 kW during one of the last 12 monthly periods, and it replaces Rate G mandatorily (except for a move to G9) when the minimum billing demand reaches 65 kW; all demand is billed, at $18.242 per kW, but energy costs less (6.292¢ then 4.666¢ per kWh).

What is minimum billing demand?

It is a demand floor billed every month, even if the actual power demand is lower. Under Rates G and M, it is 65% of the highest power demand during a consumption period falling entirely within winter (December 1 to March 31) in the last 12 months. A single winter peak can therefore affect the bill for a year.

Does the power factor affect the electricity bill?

Yes. For small and medium power, maximum power demand is the higher of the highest real power demand (kW) and 90% of the highest apparent power demand (kVA), measured over 15-minute intervals (95% for large power). A power factor below 90% can therefore increase billing demand. Hydro-Québec may adjust the minimum billing demand if the customer durably improves their power factor.

Is it still possible to sign up for a demand response option for winter 2026-2027?

According to the Rates, sign-up for the DR Leeway Option had to be done no later than September 30, 2026, and the application for the DR Commitment Option before September 30, 2026. The Leeway Option allows an exceptional mid-winter sign-up, but the credit is then reduced by 25% to 100% depending on the month of sign-up. Rate Flex M remains available to medium-power contracts with a communicating meter, provided the request is made before November 20.

Which should I choose, the DR Leeway Option or the DR Commitment Option?

The Leeway Option is more flexible: the credit depends on the average reduction actually achieved, with no premium for non-participation; no credit is paid if that reduction is below 10 kW, and Hydro-Québec may refuse the credit if no reduction is observed during more than half of the weekday events. The Commitment Option offers a more structured fixed and variable credit, but requires a specified power commitment and a load factor above 60%, and provides for charges in case of overruns. Hydro-Québec recommends that new participants start with the Leeway Option.

Is the Winter Credit Option still offered to businesses?

No, the Winter Credit Option for Rate G customers has not been available to new contracts since March 31, 2026. Contracts enrolled in it on that date retain a grandfathered right. Small businesses with a demand below 50 kW can look at Rate Flex G instead.

By how much did business rates increase in 2026?

According to the Régie de l’énergie, the increases that took effect on April 1, 2026 were 3.8% for general rates and large-power industrial rates, compared with 3% on average for domestic rates. The 3% cap set by order in council applies only to certain domestic rates. The 2027 and 2028 increases were approved on a provisional basis in April 2026.