The ÉcoPerformance program is the Government of Québec’s grant program that funds reductions in fossil-based greenhouse gas (GHG) emissions in commercial, institutional, industrial and municipal buildings. Since July 7, 2026, a new normative framework has applied to every new application: the RCx stream has ended, dual-energy (biénergie) conversions are now handled by Énergir, the former Bioénergies program has been folded in, and new payment terms apply. This guide summarizes what the official documentation supports today, to help you assess your project before you submit an application.
Information verified in October 2026 with Québec.ca and the ÉcoPerformance program normative framework in force since July 7, 2026. The normative framework takes precedence over any summary, including this one.
What is the ÉcoPerformance program?
ÉcoPerformance is a grant program that funds the analysis and implementation of energy efficiency projects, energy conversion projects and projects that reduce fugitive and process emissions, in order to reduce GHG emissions in the business sector, broadly defined. It is administered by the Ministère de l’Environnement, de la Lutte contre les changements climatiques, de la Protection de la biodiversité, de la Faune et des Parcs (Québec’s environment ministry; referred to as “MELCCFP” in the normative framework and the participant guide, which were published under the ministry’s former name) and stems from the Plan for a Green Economy 2030 (PEV 2030).
According to the normative framework in force, the program will end on March 31, 2029. The ministry may, however, limit the number of applications accepted in order to stay within the available budget envelope.
The program is aimed at organizations that consume fossil fuels (heating oil, propane, natural gas, etc.) or that use processes that generate fugitive GHG emissions. Eligibility and the amount of aid are based on GHG reductions, not on energy savings alone.
What changed on July 7, 2026?
The new normative framework applies to every application submitted since July 7, 2026. According to the program description page, the main changes are:
- End of the RCx stream: no new applications for the tune-up of building mechanical systems have been accepted since September 1, 2026.
- Dual energy (biénergie): converting natural gas heating to dual energy is no longer an ÉcoPerformance stream; aid is now offered by Énergir to its customers.
- Bioenergy: analyses and conversions to bioenergy are now handled under ÉcoPerformance.
- Expense eligibility date: it replaces the former “date d’antériorité” (prior date).
- Building measures: in standard implementation, they can be grouped into a single project.
- Payments: in standard implementation and for large industrial projects, 35%, 25%, then two payments of 20%.
- Fugitive and process emissions: minimum payback period (PRI) of two years and aid raised to $50/t CO2e.
- ISO 50001 bonus: the $10/t CO2e bonus in standard implementation has been removed.
Are your organization and project eligible?
Eligible applicants include, among others, businesses in all sectors that are legally incorporated and have an operating establishment in Québec, establishments in the public networks (health and social services, education, higher education, educational childcare services), municipal bodies, social economy enterprises (cooperatives and non-profit organizations) and Indigenous communities recognized by the National Assembly. The participant must be registered with the Registraire des entreprises du Québec (Québec enterprise register), except for the simplified implementation stream.
The main exclusions
The normative framework excludes, among others, Québec government ministries and budget-funded bodies, federal bodies, and businesses listed in the Registre des entreprises non admissibles aux contrats publics (RENA, the register of businesses ineligible for public contracts). It also excludes the owners of the following residential buildings:
- single-family, semi-detached, row, mobile homes, duplexes and triplexes;
- new multi-residential buildings of 10 storeys or fewer;
- multi-residential buildings of fewer than 20 units;
- existing multi-unit buildings with a footprint of less than 600 m² and fewer than four storeys.
For a multi-unit building, check each of these criteria. If your goal is instead mortgage financing tied to energy performance, see our article on the MLI Select (APH Select) program.
Small and medium consumer or large consumer?
Several aid parameters depend on the site’s category. A large consumer (GC) consumes 36,000 GJ or more per year of non-electric energy, established according to the baseline scenario; a small and medium consumer (PMC) consumes less. As a reference point, Québec.ca indicates that 36,000 GJ is equivalent to roughly 950,000 m³ of natural gas or 935,000 litres of heating oil.
Which projects are eligible?
In standard implementation, the project must reduce GHG emissions and fall under at least one category: energy efficiency on a fossil fuel; conversion from a fossil fuel to renewable electricity or bioenergy (or to a lower-emitting fossil fuel, for industrial process heat only); reduction of fugitive emissions (only the refrigerant R-744, i.e. CO2, is eligible when a refrigerant is replaced); reduction of process emissions; production of renewable energy consumed on site.
The project must also be additional, meaning that it must go beyond common practice and legal or regulatory obligations. If your conversion involves geothermal energy, our article on geothermal energy grants presents other sources of aid to consider.
What are the streams and how much can you get?
The normative framework has seven streams, each with its own calculation method and caps; the aid is always the lesser of the calculated amounts.
| Stream | Clientele | Maximum rate | Caps | Maximum duration |
|---|---|---|---|---|
| Standard analysis (energy, conversion or fugitive emissions study) | PMC and GC | 50% | $25,000 per site (PMC); $75,000 per site (GC) | 24 months |
| Complex analysis (process integration, data mining, computational fluid dynamics, etc.) | PMC and GC | 75% | $100,000 per site (PMC); $300,000 per site (GC) | 24 months |
| Energy management | Sites with at least 800 GJ of fossil fuels per year, not ISO 50001-certified; multi-residential excluded | 75% per category | Energy manager: $10,000; training: $50,000; external support: $100,000; measurement: $150,000; certification: $10,000 | 36 months |
| Simplified implementation | PMC only | 75%; $125/t CO2e per year over 10 years | $100,000 per project; $250,000 per site annually | 24 months |
| Standard implementation | PMC and GC | 75% | $5,000,000 per project; $10,000,000 per site per fiscal year | 60 months |
| Large industrial projects | Emitters covered by the SPEDE (Québec’s cap-and-trade system) and voluntary participants | 75%; $100/t CO2e | $40 M per project; $80 M per site until the end of the program; minimum investment of $15 M | 60 months |
| Feasibility study – waste heat | Eligible participants | 75% | $150,000 per study | 18 months |
| Waste heat recovery infrastructure | Eligible participants | 75%; combined amount in $/t CO2e and $/GJ over 20 years | $40 M per project | 60 months |
Source: ÉcoPerformance normative framework, sections 4 to 10. Most streams allow an extension of 6 or 12 months for exceptional circumstances, subject to the ministry’s acceptance.
The simplified implementation stream
The simplified stream offers aid to PMCs for three types of projects: converting a maple sap evaporator, converting a building heating system from heating oil or propane to electricity or bioenergy, and installing electric heating in a greenhouse. For a building heating conversion, annual consumption must be between 500 and 20,000 litres of light heating oil or between 750 and 30,500 litres of propane, and the measure must be maintained for at least 10 years. A project within these ranges is not eligible for standard implementation.
How is the aid calculated in standard implementation?
The aid is the lesser of three amounts: the amount that brings the payback period of the investment without aid (PRIsa) down to the minimum payback period (PRImin), 75% of eligible expenses, and an amount per tonne of CO2 equivalent reduced annually multiplied by the number of years of commitment (10 years at most). This result is then capped by the per-project and per-site maximums, the amount requested and the stacking rule.
| Category (efficiency or conversion) | PRImin | PRImax | $/t CO2e |
|---|---|---|---|
| GC – industrial | 1 year | 15 years | $50 |
| GC – commercial | 3 years | 20 years | $60 |
| GC – institutional | 5 years | 20 years | $60 |
| PMC – industrial | 2 years | 20 years | $125 |
| PMC – commercial | 3 years | 20 years | $125 |
| PMC – institutional | 5 years | 20 years | $125 |
For fugitive and process emissions, the PRImin is 2 years and the aid is $50/t CO2e for all categories. The PRImax applies neither to conversions to bioenergy nor to fugitive or process emissions projects.
- Eligibility: the PRIsa must be greater than the PRImin and less than the PRImax of the category.
- Eligible expenses: cost of the project scenario minus cost of the baseline scenario. When replacing obsolete equipment, expanding or building new, only the additional costs compared with conventional equipment count.
- Carbon tax: it is included in the cost of energy used to calculate the PRI.
- Commitment: from 1 to 10 years for energy efficiency, and at least 7 years for a conversion.
Illustration of the formula: for a commercial PMC that reduces its emissions by 100 t CO2e per year with a 10-year commitment, the GHG-based cap is 100 × $125 × 10, or $125,000. The aid will be the lesser of this amount, the amount based on the PRImin and 75% of eligible expenses. Only the ministry’s analysis sets the actual amount.
What studies and measurement should you plan for?
Except in simplified implementation, each stream requires at least one deliverable signed by an engineer (a member of the Ordre des ingénieurs du Québec, according to Québec.ca and the participant guide). The standard implementation and large industrial project streams also require a monitoring plan and the measurement of actual GHG reductions after commissioning.
For an analysis
The application includes a description of the analysis signed by an engineer. For each measure studied, the report must present the cost estimate, the savings (GHG and monetary), the PRI, the potential financial aid and the measures to prioritize. Analyses of measures that have already been implemented, or whose profitability is already known, are not eligible. The analysis stream is not a prerequisite for the other streams. To understand the process, see our article on the energy audit.
For an implementation: project plan and monitoring plan
A standard implementation application includes a project plan and a monitoring plan signed by an engineer, the energy bills and the calculation files. The project plan establishes the baseline scenario, that is, the most credible case in the absence of the aid, which can be developed from a detailed energy simulation or a representative history; energy modelling is one of the tools for establishing it. Quantification follows the guidelines of ISO 14064-2 and uses the program’s standardized emission factors.
Measurement and the project report
After commissioning, the participant applies the monitoring plan and accumulates data demonstrating the reduction relative to the baseline scenario, adjusted for actual conditions. The measurement period must allow the effect to be extrapolated to a full year. The project report, signed by an engineer, presents the results and the GHG reduction statement. The aid is then recalculated using the actual data: it can be revised downward, never upward.
How does an application work?
For standard implementation, Québec.ca and the participant guide describe the process in 10 and 16 steps respectively; here are the essentials, grouped into eight stages:
- Complete application sent by email to transitionenergetique.affaires@environnement.gouv.qc.ca: Excel form, form signed by an authorized person, project plan and monitoring plan signed by an engineer.
- Expense eligibility date: receipt of the complete application minus 30 calendar days. It does not guarantee that aid will be granted.
- Analysis and financial assistance agreement specifying the maximum amount.
- First payment (35%) on presentation of the first purchase orders.
- Progress report and second payment (25%), optional, when more than 50% of the work is completed.
- Commissioning report and third payment (20%, or 45% without step 5).
- Measurement, project report and final payment (20%), adjusted to actual results.
- Annual follow-up throughout the commitment period.
For the analysis and energy management streams, the aid is paid in two instalments of 50%, usually within 45 days of the validation of deliverable compliance under the participant guide.
Can ÉcoPerformance be combined with Hydro-Québec, Énergir or federal programs?
Yes, within certain limits: stacked public aid must not exceed 75% of expenses, and the same measure cannot be funded by several programs arising from the PEV 2030. The normative framework provides in particular:
- 75% cap on the combined aid from Government of Québec ministries, bodies and enterprises, Québec and Canadian Crown corporations (including tax credits) and municipal entities. Repayable aid counts at 100% of its value.
- PEV 2030 programs: no stacking for a project presenting the same GHG reduction measures.
- Analysis stream: aid from Hydro-Québec and aid from Énergir and Enbridge are not accepted in combination.
- Energy management stream: aid from energy distributors is not accepted, and a project eligible for Hydro-Québec programs is excluded.
- Loans: according to the participant guide, a loan, including SOFIAC financing, is not counted in the stacking calculation.
For its part, Hydro-Québec may refuse or revise aid under its Solutions efficaces program (efficient solutions program) if the same project or the same energy analysis is submitted to another organization. Énergir’s dual-energy offer, backed by the PEV 2030, targets its commercial, institutional and multi-tenant customers with buildings of 20 or more units; it can cover up to 80% of additional costs, up to $250,000 per site, or $6,000,000 per site for complex projects handled by an engineer.
In practice, the participant guide requires you to isolate the savings from measures funded by ÉcoPerformance from those that are not. As a precaution, it is best to submit a given measure to only one program when a rule requires it or allows the aid to be revised (PEV 2030 programs, Hydro-Québec). Federal aid must be declared along with the other sources of funding.
What pitfalls should you avoid?
Most refusals and aid reductions stem from scheduling, expense eligibility or documentation, rather than from the technical quality of the project.
- Incurring expenses too early: only expenses invoiced on or after the eligibility date are eligible. The guide recommends not awarding a contract to a consultant before a complete application has been submitted. For the waste heat streams, expenses count only from the signing of the announcement letter.
- Proposing an excluded measure: in standard implementation, envelope insulation and air sealing are not eligible, nor is a centralized control system implemented on its own or an efficient boiler in a new building.
- Underestimating the baseline scenario: if the equipment is at end of life or if the project resolves a maintenance or code-compliance problem, that cost goes into the baseline scenario and reduces eligible expenses.
- Neglecting the call for tenders: the normative framework requires a public call for tenders of at least 15 days for any construction contract of $100,000 or more, with exceptions for certain public and municipal bodies.
- Counting on an increase in aid: no cost overrun entitles you to additional aid.
- Using an outdated form: the ministry may refuse an application that does not use the latest version of the documents.
- Ignoring internal caps: internal salaries are capped by job category and administrative fees at 5% of eligible expenses.
How ORT Énergie can support you
ORT Énergie is an energy efficiency engineering consulting firm that supports organizations in their financial aid applications. ÉcoPerformance’s requirements overlap with our areas of expertise: energy audits, energy modelling and simulation to establish a defensible baseline scenario, decarbonization strategies and geothermal energy.
Our founder, Massi Ourtirane, Eng., M.Eng., LEED AP BD+C, RCx, can help you choose the relevant stream, assess the PRI and the GHG-based cap for your measures, and prepare a rigorous project plan and monitoring plan. In energy management, ORT Énergie has notably supported GEA Farm Technologies in Drummondville with the implementation of the ISO 50001 standard and the development of a decarbonization plan.
Conclusion
Until March 31, 2029, ÉcoPerformance brings several PEV 2030 measures together under a single normative framework, including the former Bioénergies program, to reduce fossil-based GHG emissions from businesses, institutions and municipalities. The July 2026 framework tightened several rules and removed RCx and dual energy. Before incurring expenses, validate your category (PMC or GC), the applicable stream, the PRI of your measures and your stacking strategy: a solid baseline scenario and a realistic monitoring plan limit the risk of the aid being reduced at the final payment.
Frequently asked questions (FAQ)
Is the ÉcoPerformance program still open in 2026?
Yes. The normative framework that came into force on July 7, 2026 provides that the program will end on March 31, 2029. The RCx stream, however, has not accepted new applications since September 1, 2026, and dual energy is now offered by Énergir.
Which ministry administers the ÉcoPerformance program?
The program is administered by the Ministère de l’Environnement, de la Lutte contre les changements climatiques, de la Protection de la biodiversité, de la Faune et des Parcs (Québec’s environment ministry), through its Bureau de la transition climatique et énergétique (climate and energy transition office). The normative framework and the participant guide, published under the ministry’s former name, still use the acronym MELCCFP. Applications are sent to transitionenergetique.affaires@environnement.gouv.qc.ca.
What is the maximum amount in standard implementation?
The aid is limited to $5,000,000 per project and $10,000,000 per site per fiscal year, without exceeding 75% of eligible expenses. The actual amount is the lesser of three calculations based on the minimum PRI, eligible expenses and a rate of $50 to $125 per tonne of CO2 equivalent reduced annually, depending on the site category.
Is a multi-unit building eligible?
Some are. The normative framework excludes multi-residential buildings of fewer than 20 units, new multi-residential buildings of 10 storeys or fewer and small existing buildings with a footprint of less than 600 m² and fewer than four storeys. The energy management stream excludes all multi-residential buildings.
Can work begin before the ministry replies?
Expenses invoiced on or after the eligibility date, which is 30 calendar days before receipt of a complete application, may be eligible. This date does not guarantee aid: only the ministry’s technical analysis leads to it. The participant guide recommends not awarding a contract before a complete application has been submitted.
Can ÉcoPerformance be combined with a Hydro-Québec grant?
You should avoid submitting the same measure to both programs. The analysis stream does not allow stacking with Hydro-Québec aid, and Hydro-Québec may refuse its aid if the same project is submitted to another organization. In a multi-measure project, the prudent approach is to assign each measure to only one of these programs, isolate the savings from the measures funded by ÉcoPerformance and respect the 75% stacking cap.