Efficient Solutions is the program through which Hydro-Québec provides financial support to its business customers to identify and carry out energy efficiency projects, with or without power demand management measures. It has four components, three of which concern businesses and institutions: Energy Analysis, Small Businesses, and Medium and Large Businesses. The guides currently in effect are dated March 2026.
Information verified in November 2026 against Hydro-Québec’s Efficient Solutions web pages and the March 2026 participation guides. The web pages carry no update date; the dates cited are those of the guides. Hydro-Québec may change the program at any time: always confirm the terms with it before committing.
How is the program structured?
According to the March 2026 guide, the program has four components, each with its own participation guide: Energy Analysis, Small Businesses, Medium and Large Businesses, and Agricultural. The Agricultural component is not covered in this article.
- Energy Analysis: support to finance the study that identifies the measures to carry out.
- Small Businesses: for buildings on Rate G or Flex G.
- Medium and Large Businesses: for buildings on any other business rate, with two offers. The simplified offer relies on the OSE calculation tool and predefined measures; the custom offer covers measures that are not listed in it.
Power demand management measures (automation of peak strategies) are eligible under the simplified offer, but not under the custom offer. Photovoltaic panels are also simplified-offer measures and are treated by the program as energy efficiency measures. The program criteria were changed on March 31, 2026; projects whose work started before that date fall under the transitional rules published by Hydro-Québec.
Hydro-Québec’s page on business energy management also presents, separately, an energy management system intended for the industrial sector. According to that page, only Rate L customers and those with a special contract are eligible for this program, which is separate from Efficient Solutions; consult the page for the conditions and amounts.
Who is eligible?
For the Medium and Large Businesses component, the building must be in Québec, intended for commercial, institutional or industrial activities, subject to a business rate other than G or Flex G, and supplied by the Hydro-Québec grid, an eligible off-grid network, or an eligible municipal or cooperative network. The rate therefore determines the component; our article on Hydro-Québec business electricity rates explains how to tell them apart.
The guide also specifies that the following are eligible:
- residential buildings of twenty or more units, existing or new; measures installed by the owner of an existing unit are not eligible under this program, but may be eligible under the LogisVert residential program;
- buildings under construction that are temporarily connected, and those associated with a special contract.
Buildings supplied by an off-grid network or by a municipal or cooperative network are not eligible for power demand management measures. A project is not eligible if it involves measures already submitted to Hydro-Québec within the five years following the end of the previous project’s work, or if it is mandatory to comply with a law, regulation or standard.
What does the Energy Analysis component fund?
This component funds the energy analysis of a building or process whose reference electricity consumption is at least 1 GWh. According to the guide, the support is paid in two instalments: 40% of the eligible analysis costs after the measures are identified, then 60% after measures are implemented. The caps depend on the reference consumption and on whether power demand management measures are included:
| Reference consumption | Efficiency only (1st + 2nd instalment) | Efficiency and power management |
|---|---|---|
| 1 to 2 GWh | $8,000 + $12,000 ($20,000) | $9,600 + $14,400 ($24,000) |
| Over 2 GWh | $20,000 + $30,000 ($50,000) | $24,000 + $36,000 ($60,000) |
The $50,000 and $60,000 amounts highlighted by Hydro-Québec are therefore maximums that apply to the largest consumers. To be eligible, the analysis must target a consumption reduction of at least 100,000 kWh (existing buildings of 1 to 2 GWh), at least 200,000 kWh (over 2 GWh), or 20% or more for a new building.
Conditions to keep in mind:
- the proposal must be approved by Hydro-Québec before the analysis start date and before work begins;
- the report is due within twelve months of the proposal’s acceptance, and the analysis must be verified by an engineer who is a member of the Ordre des ingénieurs du Québec (Québec’s order of engineers);
- an analysis is not eligible if it targets solely or mainly lighting, resistive electric heating, behavioural measures, obtaining a certification or demonstrating performance (the guide gives as an example a simulation required by the Régie du bâtiment du Québec, the province’s building board), nor a diagnostic for retuning mechanical systems.
The last condition matters if you are thinking of an energy audit or recommissioning: the component targets the identification of efficiency measures to carry out, not retuning alone. The costs of implementing the measures are not covered by this component, but may be covered by the other components. The participant must also declare any other financial support obtained, so that the total does not exceed 100% of the cost of the analysis.
How does the simplified offer (OSE) work?
The simplified offer pays support calculated by the OSE tool for predefined measures; according to the guide, the support paid is the lesser of the amount determined by OSE and $5 million per project, with a minimum of $1,000. Hydro-Québec states that this offer covers up to 75% of eligible costs for medium and large businesses, and that a bonus of up to 10% (two categories of measures) or 15% (three categories) is added when several eligible measures are carried out; its FAQ ties this bonus to heat recovery, geothermal heat pumps and the building envelope. These rates come from the web pages: the guide simply refers to the amount calculated by OSE.
Main conditions:
- new equipment only, certified or approved by recognized bodies or by Hydro-Québec, installed by a company holding the required licences (including, where applicable, the Régie du bâtiment du Québec licence);
- minimum customer contribution of 25% of eligible costs (60% for photovoltaic panels);
- application after the work: the simplified offer is submitted once the work is completed, with the invoices, using the version of OSE that matches the work start date. Hydro-Québec states that OSE 6.0 replaced OSE 5.1 on March 31, 2026;
- power management: automating strategies requires enrolment in a power demand management rate option, with peak events of at least 40 hours per winter and no more than two per day, for five years after payment.
The work start date is the earlier of two dates: the signing of the first contract with the contractor or the first equipment purchase for the project. Projects involving heat pumps submitted to the ÉcoPerformance program (commercial and institutional dual-energy component) are excluded (see below).
How is assistance under the custom offer calculated?
The custom offer is intended for projects whose measures are not in OSE; the support is the lowest of four amounts, according to the March 2026 guide:
- 45¢ per eligible kWh saved;
- the amount that brings the payback period (PRI) on electricity savings down to one year;
- 75% of total eligible costs for an existing building, or 15% for a new building, the addition of production lines and efficient electrification projects (with an exception, subject to approval, based on additional costs);
- $5 million per project.
The project must generate at least 25,000 kWh of annual electricity savings across all the buildings concerned, must not have a payback period under one year after support, and must involve new equipment. The savings are based on the difference between the consumption of the baseline scenario and that of the efficient scenario, established by calculation or by measurement approved by Hydro-Québec. Eligible costs include purchase and installation, measurement, engineering, plans and specifications, and internal labour.
The process unfolds as follows, according to the guide:
- eligibility validation with Hydro-Québec (1-800-463-9900 or form), then a project proposal;
- written acceptance, with a receipt date that precedes the start of work and that determines the applicable version of the program;
- acceptance of the measurement plan or calculations, pre-work measurement if needed, then an email confirming the expected support;
- completion, then post-work measurement: the report must be completed by an engineer or another professional recognized by Hydro-Québec, who enters their member number on it;
- invoice to be submitted within 30 days of the billing request; Hydro-Québec pays the support about 45 days after receiving a compliant invoice.
A project whose work begins before the proposal is accepted is not eligible for the custom offer. You must therefore wait for that acceptance before signing a contract or ordering equipment.
What about the Small Businesses component?
The Small Businesses component is aimed at businesses whose buildings are on Rate G or Flex G. According to the March 2026 guide, the support is calculated by the OSE tool and equals the lesser of the amount determined by OSE and $5 million per project; it must be at least $500, and the participant or customer contributes at least 10% of total eligible costs (60% for photovoltaic panels). This is where the up-to-90% rate advertised by Hydro-Québec comes from: it applies to this component, not to medium and large businesses, whose advertised maximum rate is 75%. The eligibility conditions are similar to those of the simplified offer (new equipment, work carried out by a company holding the required licences, exclusion of projects involving heat pumps submitted to ÉcoPerformance); consult the component’s guide for details.
Can it be combined with other programs?
Only two official rules emerge from the documents we read. Hydro-Québec’s guides specify that a project is not eligible if it includes heat pumps that the participant submits or has submitted as part of projects under the ÉcoPerformance program, commercial and institutional dual-energy component. That component has since been withdrawn from ÉcoPerformance and assistance for commercial and institutional dual-energy systems is now managed by Énergir: see our article on dual-energy systems in commercial and institutional buildings. For the custom offer, the participant must declare to Hydro-Québec any other financial support obtained or applied for from a third party. And submitting the same project to several programs may lead Hydro-Québec to terminate it.
Hydro-Québec does not address, in these documents, combining with Énergir programs; we therefore do not claim it. For buildings heated with natural gas, consult Énergir grants for businesses instead, and validate any combination directly with both distributors.
What should you do before applying?
Before signing a contract or buying equipment, you need to establish the applicable component, check the conditions and, depending on the offer, obtain Hydro-Québec’s acceptance. In practice:
- confirm the building’s rate, which determines the component;
- check the applicable version of the program: the work start date or the proposal receipt date determines the rules and the OSE version;
- for the energy analysis and the custom offer, wait for Hydro-Québec’s written approval before starting;
- keep invoices, quotes and data sheets; any document sent to Hydro-Québec must be written in French, except as provided for in the Charter of the French Language;
- plan for the minimum customer contribution and the performance measurement that the custom offer will require.
The program may be modified or abolished at any time and without notice, according to the Terms and Commitments document. Efficiency projects can also be part of an energy management system: see our article on the ISO 50001 standard.
How ORT Énergie can help
ORT Énergie is an energy efficiency engineering consulting firm. Depending on the need, it can carry out an energy audit or an energy simulation to determine the measures to implement, provide commissioning and recommissioning, support the implementation of an ISO 50001 energy management system, and assist with financial assistance applications. We start by understanding your building, your rate and your project timeline.
Frequently asked questions (FAQ)
What is the cap on Efficient Solutions assistance?
According to the March 2026 Medium and Large Businesses guide, support is capped at $5 million per project, under both offers (an older page mentioned $3 million for the custom offer; the March 2026 guide prevails). For the energy analysis, the maximum is $50,000 (efficiency only) or $60,000 (with power management), for consumption over 2 GWh.
Is Hydro-Québec’s approval needed before starting work?
It depends on the offer. For the custom offer and for the energy analysis, yes: the proposal must be accepted before work begins. The simplified offer is submitted after the work, but the OSE version to use depends on the work start date.
Is an engineer required?
For the energy analysis, the report must be verified by an engineer who is a member of the Ordre des ingénieurs du Québec. For the custom offer, the post-work measurement report is completed by an engineer or another professional recognized by Hydro-Québec, when measurement is required.
What is the minimum amount of assistance?
For the simplified offer under the Medium and Large Businesses component, the support must be at least $1,000 according to the March 2026 guide. For the Small Businesses component, the March 2026 guide sets the minimum at $500. The $2,500 amount corresponds to an earlier version of the program; an older Medium and Large Businesses page still displays it, but the guide dated March 2026 prevails.
How long does it take to receive the assistance?
Hydro-Québec pays the support about 45 days after receiving a compliant original invoice, which the participant must submit within 30 days of the billing request. The guide sets no overall deadline for reviewing the file.
Is a multi-unit residential building eligible?
Yes, for the Medium and Large Businesses component, if the building has at least twenty units. Measures installed in an existing unit by its owner are not eligible under it and may be eligible under Hydro-Québec’s LogisVert residential program.