Novoclimat is Québec’s certification program for new residential buildings that perform better than the regulations require. Its Large multi-unit building stream targets developers of projects over 600 m² or four to ten storeys: the project must be registered before work begins, meet prescriptive technical requirements, pass site inspections (including an air leakage test), and then be certified. The financial assistance, calculated per unit, is paid to the developer after certification.
Information verified in November 2026 against Québec.ca (Novoclimat program pages, whose update dates range from June 2025 to November 2026), the stream’s official reference documents (normative framework, participation procedures, technical requirements) and a CMHC guide.
What is the Large multi-unit building stream of Novoclimat?
It is the Novoclimat stream for new multi-unit residential buildings of more than 600 m² or at least four storeys, up to ten storeys. Novoclimat has three streams: House (single-family, two-generation or accessory-unit homes), Small multi-unit building (three storeys or fewer and 600 m² or less) and Large multi-unit building. This article covers the latter; the single-family house is mentioned only to place the program in context.
According to the normative framework, the program has existed since 1999. The stream’s technical requirements indicate that meeting the program’s prescriptive requirements helps reduce energy consumption by about 20% compared with a similar building designed under Part 11, Energy Efficiency, of Chapter 1 of the Québec Construction Code. They also specify that they do not replace the applicable codes, laws and regulations and that the applicant and the other parties remain responsible for complying with them, including the regulation on energy conservation in new buildings. Certification (called “homologation” in French) is granted to the whole building at the end of construction.
For a developer, the benefit is twofold: a recognized certification and per-unit financial assistance. CMHC also lists Novoclimat certification for large multi-unit buildings among the certifications it accepts for MLI Select (APH Select) (see below).
Who administers the program in 2026?
According to the program’s About page on Québec.ca, updated on November 17, 2026, the program is administered by the Ministère de l’Environnement, de la Lutte contre les changements climatiques, de la Protection de la biodiversité, de la Faune et des Parcs (Québec’s environment ministry). Neither Hydro-Québec nor Transition énergétique Québec (TEQ) is named there as an administrator.
This point deserves attention, because the technical documents still carry former names. The normative framework in force is dated September 15, 2020 and refers to TEQ; the participation procedures (version of April 4, 2022) refer to the Ministère de l’Énergie et des Ressources naturelles; the technical requirements (version revised on December 1, 2023) refer to the MELCCFP. The Québec.ca reference documents page (updated on February 11, 2026) presents these three documents as the versions in force, without indicating a version date. The documents and forms are available on Québec.ca and on the transitionenergetique.gouv.qc.ca website.
Which buildings and developers are eligible?
Eligible is the individual or legal entity that is the developer of a new building meeting the following criteria and that acts as the applicant. The conditions from the official pages and the normative framework are as follows:
- Building type: multi-unit residential building of more than 600 m² (building area) or at least four storeys, up to a maximum of ten storeys.
- Territory: project carried out in Québec, south of the 51st parallel.
- Main heating energy: electricity, natural gas or residual forest biomass. Main heating with an eligible heat pump is considered electricity.
- New construction: a major renovation project can be admitted only exceptionally, after acceptance by the ministry.
- Mixed uses: housing must represent 33% or more of the building’s floor area.
- Registration before work: a separate registration is mandatory for each building.
- Ventilation: use of a Novoclimat-certified ventilation specialist.
The general contractor is not required to be Novoclimat-certified in this stream; only the ventilation specialist must be. This is a difference from the Small multi-unit building stream, which requires a certified contractor. Buyers of new condos do not receive the assistance: it is paid to the developer. Social-purpose buildings (admitted by the Société d’habitation du Québec to AccèsLogis or to the Programme d’habitation abordable Québec) receive enhanced assistance.
What are the technical requirements?
The requirements are prescriptive: the Novoclimat technical requirements document for large multi-unit buildings sets measures for the envelope, air tightness, ventilation and mechanical systems rather than a simulation result. According to the technical requirements, the ones that apply are those in force when a project’s registration application is made; it is up to the applicant and its parties to use the most up-to-date requirements for design.
Version to use
The version published on Québec.ca in November 2026 is the one revised on December 1, 2023, in force since January 1, 2024. It replaced the version of December 27, 2021. The document announces two updates a year (January and August) and technical notes between revisions; the page also lists a technical note on the positioning of grilles (articles 3.4.9 and 3.4.10), whose file name indicates 2026. Check the reference documents page before locking in your plans, because a technical note can change a requirement.
What the requirements cover
- Envelope and insulation: minimum values and assemblies (the program provides assembly drawings and a tool for calculating effective thermal resistance).
- Air tightness: Table 2.2.2.1 sets a maximum air leakage of 1.5 air changes per hour at 50 Pa for the building types it lists (detached, attached), measured by an air leakage test according to standard CAN/CGSB-149.10-M86. A note to the table allows the test conditions to be adapted to the building type; confirm the target that applies to your project with the program.
- Ventilation: airflow rates, heat recovery ventilators and eligible control devices (lists of eligible equipment are published), with an airflow balancing report on request.
- Mechanical systems and water heating: performance criteria.
The documents we reviewed describe no energy modelling requirement for this stream: the procedure page mentions no modelling step, and the approval criterion is compliance with the prescriptive requirements. This says nothing about other programs that may require modelling.
The normative framework specifies that certification is granted to the building as a whole, as a system. The participation procedures note that non-compliance cases frequently arise from a deficient initial design or a lack of coordination among the parties, and recommend an integrated approach from design through the end of construction.
What financial assistance is available, and for whom?
The assistance is an amount per unit, paid in a single payment to the developer (the applicant) once the building is certified. The amounts below come from the financial assistance page of the Large multi-unit building stream (updated on June 10, 2025):
| Building and unit type | Assistance per unit |
|---|---|
| Private building: unit including a kitchen and a bathroom | $1,300 |
| Private building: unit with one bedroom, without a kitchen or without a bathroom (1 or 1½) | $445 |
| Social-purpose building: two or more bedrooms, with kitchen and bathroom (4½ or larger) | $2,925 |
| Social-purpose building: a single bedroom, with kitchen and bathroom (loft, 2½ or 3½) | $1,685 |
| Social-purpose building: a single bedroom, without a kitchen and bathroom or without one of the two (1 or 1½) | $885 |
The normative framework (in force on September 15, 2020) specifies that the assistance amount cannot exceed $1,300 per unit for a private building and $2,925 for a social-purpose building, which matches the highest amounts in the table. It also provides assistance for installing a more efficient mechanical system (the number of units of equipment is limited according to the number and type of dwellings) and a bonus for a combination of measures carried out in the same participation application.
Please note: the program’s general overview page (updated on November 19, 2025, and therefore more recent than the stream page) states that assistance to developers ranges from $445 to $1,700 depending on the building type and the number and type of units, and from $885 to $3,400 per unit for social-purpose buildings. These ranges differ from the amounts on the stream page and in the normative framework. Only the stream page details amounts by unit type; before building an incentive into a budget, confirm the amount that applies to your project with the program.
What are the steps and deadlines?
The process has four stages: registration, site monitoring, certification and financial assistance. Here are the milestones to plan for.
- Choose the parties. The certified ventilation specialist must be designated no later than before the first inspection; the contractor must be designated before work begins if it is not known at registration.
- Register the project before work. All three sections of the registration form (applicant, architecture, mechanical) must be completed and the plans and specifications attached. The procedures call for sending the file at least 30 working days before construction work begins; Québec.ca recommends registering the project before soliciting bids or obtaining the permit. A project submitted after work has begun (foundation, demolition, etc.) is automatically refused. An evaluation advisor reviews the file, and the project is officially registered only upon receipt of the confirmation letter.
- Monitor the site. Three mandatory inspections, to be requested by form at least 72 hours in advance: “P” (foundation insulation, before the slab is poured), “A” (visual inspection and air leakage test, after the envelope is insulated and sealed but before finishes) and “B” (final inspection and ventilation balancing report, before occupancy). The test can be repeated at most twice; if the air tightness target is still not met, the building cannot be certified.
- Apply for certification. The form must be submitted within 60 days of the last inspection; the ministry issues the certificate if the building complies.
- Receive the assistance. According to Québec.ca, the assistance is paid within 10 weeks of the forms being filed.
As for deadlines, the procedures allow 6 months after official registration to start work and 24 months to obtain certification. At the end of either period, the ministry may close the file after 30 days’ notice; an additional period may be authorized. The normative framework also specifies that the program ends when the budget is fully committed or by decision of the ministry, with or without notice: registration therefore does not, in itself, guarantee that the assistance will be available through to the end of the project.
Can Novoclimat be combined with other incentives?
The normative framework and the stream pages do not address combining Novoclimat assistance with other programs; the applicable rule must therefore be confirmed with each program concerned, including those of Hydro-Québec and Énergir. For Énergir incentives in general, see our article on Énergir grants for businesses.
There is a link on the CMHC side. Its guide to the documents required for MLI Select (APH Select), a mortgage loan insurance product (not a grant) for multi-unit buildings, lists Novoclimat – Large multi-unit buildings certification (version 2.0, “Certified” status) among the green building certifications accepted for new buildings, with a MLI Select energy efficiency level of tier 1. For the details of the thresholds and documents, see our article on the MLI Select (APH Select) program and our article on energy modelling. The guide states that this information may change at any time and invites you to confirm with CMHC.
How ORT Énergie can help
ORT Énergie is an energy efficiency engineering consulting firm and offers support for the Novoclimat program. For a multi-unit project, this can fit with our other services: energy modelling, design of plans and specifications, and support with financial assistance applications. The firm’s role is to help you read the requirements in force on the registration date, integrate them early in design and build the file; decisions on eligibility, registration, certification and assistance amount rest with the ministry.
Frequently asked questions (FAQ)
Does Novoclimat apply to buildings of more than ten storeys?
No. The Large multi-unit building stream covers multi-unit residential buildings of more than 600 m² or at least four storeys, up to a maximum of ten storeys. For a taller building, the normative framework we reviewed provides no eligibility.
Who receives the financial assistance in a condo project?
The developer, that is, the project applicant, receives the assistance after the building is certified. Buyers of new condos do not receive it.
Do we have to hire a Novoclimat-certified contractor?
Not for the general contractor in the Large multi-unit building stream. However, the main ventilation system must be installed by a Novoclimat-certified ventilation specialist. The Small multi-unit building stream, by contrast, requires a certified contractor.
Can a project whose work has already started be registered?
No. According to the participation procedures, any project submitted after construction work has begun (foundation, demolition, etc.) is automatically refused. Registration must be confirmed by the ministry before work begins.
Is an energy model required for Novoclimat?
The documents we reviewed describe compliance with prescriptive requirements, verified by inspections and an air leakage test, with no modelling step. A model may, however, be required by other programs; check their own rules.
How long does it take to complete a registered project?
The participation procedures allow 6 months after official registration to start work and 24 months to obtain certification. The ministry may close a file after these periods, with 30 days’ notice, or grant an additional period.
Where can I find the up-to-date technical requirements?
On the reference documents page of the Large multi-unit building stream on Québec.ca, which publishes the version in force, the technical notes, the assembly drawings and the forms. The requirements that apply are those in force on the date of the registration application.
Sources: Québec.ca, Novoclimat reference documents; eligibility criteria; financial assistance; construction procedure; CMHC, MLI Select, required documents.