In October 2026, Énergir offers 16 energy efficiency grants to its business customers: commercial, institutional, industrial and multi-unit residential. They range from the feasibility study to dual energy, including recommissioning of mechanical systems, boiler system optimization and new construction. Several terms changed on February 25, 2026, and the commercial dual-energy offer was redesigned on April 1, 2026. Here is the inventory of programs currently in force, how each incentive is calculated, its caps, the conditions that cause an application to fail and the stacking rules with ÉcoPerformance and Hydro-Québec.
Information verified in October 2026 with Énergir (program pages and participant guides), the ministère de l’Environnement, de la Lutte contre les changements climatiques, de la Protection de la biodiversité, de la Faune et des Parcs (Québec’s environment ministry; ÉcoPerformance program) and Hydro-Québec. Énergir states that its grants are subject to change without notice: confirm the terms before committing any expense.
What grants does Énergir offer businesses in 2026?
Énergir’s energy efficiency programs page lists 16 offers for business customers, grouped into seven families:
- Efficient appliances: condensing unit heater, infrared heating equipment, smart thermostat, variable-speed hood;
- Diagnosis and implementation: feasibility study, implementation of efficient measures, recommissioning of mechanical systems, steam trap maintenance, boiler system optimization, energy management system (EMS);
- Efficient construction and renovation: new efficient construction, efficient renovation;
- Innovation;
- Renewable energy (solar preheating);
- Supplement for low-income households;
- Dual energy, electricity and natural gas, commercial and institutional component.
At the time of our verification, none of these programs was shown as suspended or closed. Three benchmarks apply to almost all of them: the applicant must be an Énergir customer or about to become one, the application must be filed before the work (or before installation), and Énergir’s fiscal year runs from October 1 to September 30, with implementation files due no later than September 15 to be counted in the current year.
Feasibility study: how much does Énergir reimburse?
Énergir reimburses the lesser of 50% of the pre-tax cost of the study or $50,000 per account number and per fiscal year, according to the Studies and Implementation participant guide (revised February 25, 2026). This component funds the techno-economic audit that precedes implementation.
- Eligible customers: commercial, multi-tenant buildings of four or more units, institutional and industrial sectors.
- Who carries out the study: a firm listed in Énergir’s registry of registered firms or an engineer employed by the customer; the study is carried out or verified by a member of the Ordre des ingénieurs du Québec (OIQ).
- Pre-approval: the application and the service offer are filed before the analysis work begins; the study must be completed within six months of acceptance, and a preliminary version must be submitted to Énergir before it is presented to the customer.
- Exclusions: facilities that were the subject of a similar study in the past five years; studies that mainly deal with natural gas substitution, equipment modernization or rate optimization; studies funded by ÉcoPerformance.
Implementation of efficient measures: how is the incentive calculated?
The implementation incentive is $1.00 per cubic metre of natural gas saved in the first year, for measures whose investment payback period (gas PBP, or PRIgaz) is between 1 and 20 years. This is Énergir’s custom component: it covers any measure that reduces gas consumption and is not already covered by another Énergir program.
Calculation and caps
- Cap: $1,000,000 per account number and per fiscal year, or 50% of eligible pre-tax expenses (incremental costs), whichever is lower.
- Thresholds: applications under $1,000 and measures with a gas PBP of less than one year are not eligible, and the incentive is limited so that the gas PBP, once the incentive is deducted from the expenses, does not fall below one year; a measure whose gas PBP exceeds 20 years is eligible if the overall gas PBP of the project remains at 20 years or less.
- Deadline: one year from the financial assistance letter to carry out the measures.
- Savings monitoring: mandatory for projects of 500,000 m³/year and more, voluntary below that threshold; additional incentive of 80% of monitoring expenses, up to $15,000.
- Large projects: since February 25, 2026, Énergir announces an advance financial incentive of 25% at the start of the project for projects over $750,000, subject to conditions to be confirmed with the assigned advisor.
Measures must be recommended in a feasibility study or a document signed by an engineer who is a member of the OIQ. Behavioural measures with no equipment expense, maintenance measures and measures aimed at replacing natural gas with another energy source are excluded.
Heat recovery and renewable thermal energy
Geothermal, air-source systems and heat recovery are accepted if the recovered energy is marginally free, comes from unused waste heat generated on site or from a renewable source, and reduces gas consumption. With a heat pump, the electricity consumed by the compressor is deducted from the savings. After the project, gas consumption must represent at least 30% of initial consumption, or 10% if the residual gas is entirely renewable natural gas (minimum three-year commitment).
Replacement of boilers and equipment
Adding a natural gas boiler or replacing an end-of-life boiler may be eligible if its efficiency exceeds the current standard and the incremental cost is justified; a replacement before the end of useful life must be validated with Énergir. Equipment covered by the prescriptive grants (see below) falls under those programs and not under implementation.
Recommissioning (RCx): what are the conditions?
The Recommissioning of mechanical systems component funds up to $100,000 per project for buildings, or groups of buildings, that consume at least 75,000 m³ of natural gas per year (buildings below this threshold may be admitted with Énergir’s specific approval), according to the participant guide in force since November 5, 2024. For the process itself, see our article on building recommissioning.
- Investigation, transfer and continuous monitoring: 75% of eligible costs; monitoring lasts a minimum of 2 years and a maximum of 10 years.
- Implementation: $1/m³ saved, up to 75% of eligible costs, for measures with a payback period of at least one year.
- Conditions: be a current Énergir customer; be supported by an accredited recommissioning agent working within a registered firm; file the application before the project; no incentive paid to the building in the past five years under the Recommissioning or New Construction components.
- Exclusions: equipment replacement, process measures, rate optimization, maintenance and energy substitution.
Boiler systems, steam and EMS: what incentives for large consumers?
Three programs target high-consumption facilities: boiler system optimization (up to $340,000 per boiler), steam trap maintenance (up to $106,700 per maintenance) and the energy management system (up to $1,175,000, industrial customers).
Boiler system optimization
The program targets steam or hot-water boiler systems in the commercial, institutional, industrial and multi-unit residential (four or more units) sectors. According to the program page:
- economizer (steam boilers): $30 to $300 per BHP, up to 75% of eligible costs, maximum of $150,000 (integrated) or $300,000 (non-integrated);
- micro-modulation system: $30,000 per boiler; O₂ probe (with existing micro-modulation): $10,000 per boiler, each up to 75% of eligible costs;
- piping insulation: $12 to $31/sq. ft.; fitting insulation: $30 to $2,200 per unit, maximum of $100,000/year.
Form I must be submitted before the work begins, and the work may only start after Énergir’s eligibility email. The same measure cannot be subsidized both here and under the Implementation component.
Steam trap maintenance
For facilities where more than 50% of the steam is produced with natural gas: audit covered at 100%, up to $6,700; replacement or repair at $100 to $225 per trap (50% of costs); automatic monitoring at $100 per trap if leased or $550 if purchased; insulation at $150 per trap. The customer uses a supplier authorized by Énergir and registers before the measures are carried out.
Energy management system (EMS)
The EMS program, amended on February 25, 2026, is aimed at industrial sites consuming at least 2 Mm³ of natural gas per year. It covers up to 75% of eligible costs for the diagnostic analysis, EMS implementation, measurement and verification, and hiring a consultant, up to $175,000 for the implementation phase, then pays a performance incentive of $0.50/m³ saved, up to $1,000,000 over the life of the project (75 months maximum). A version harmonized with Hydro-Québec targets Rate L sites: the implementation-phase caps of the two distributors are then combined. The EMS is inspired by the ISO 50001 standard; measures requiring a capital investment are excluded.
Which efficient appliances are subsidized?
Four appliances are covered by a prescriptive grant, either a fixed amount or an amount calculated according to the equipment:
- Condensing unit heater: up to $4,500 per unit, depending on capacity; contract signed with an Énergir representative or partner before installation.
- High-efficiency infrared heating equipment: $800, regardless of output; contract before installation.
- Variable-speed hood (restaurants and cafeterias): $3,750 plus $0.75 per CFM of the exhaust system, up to 75% of acquisition costs; notice of intent before installation; in new construction, cumulative airflow of 5,000 CFM or less.
- Smart thermostat certified ENERGY STAR: $100, up to 75% of the cost; application within 30 days of purchase.
In all cases, the appliance must appear on the list of eligible models published by Énergir.
New construction and renovation: what does Énergir fund?
Énergir pays $5/m³ saved for a new building that outperforms the code, up to $325,000 per account, and up to $100,000 per year for envelope renovation.
New efficient construction
According to the guide in force since February 25, 2026:
- Performance: at least 5% better than the baseline of the 2015 National Energy Code of Canada for Buildings as modified for Québec (NECB 2015-Qc) (10% for Québec government buildings); new constructions, additions and major renovations.
- Threshold: minimum savings of 15,000 m³, i.e., applications of at least $75,000 excluding simulation.
- Caps: $325,000 per account and at most 75% of incremental costs, which Énergir estimates at 8% of investment costs; integrated design costs are now eligible.
- Simulation: 50% of the costs, up to $15,000; eQuest, EnergyPlus, IESVE or other approved software (TRACE and HAP refused), carried out or verified by an OIQ engineer from a registered firm.
- Deadlines: declaration of interest before the plans and specifications are submitted, preliminary simulation within 3 months, then 3 years to build.
Natural gas must be used for space heating or hot water heating, and only gas heating savings count; domestic hot water flow measures are no longer eligible. Early energy modelling makes it possible to check that the threshold is met before filing.
Efficient renovation
According to the guide in force since May 19, 2025, the incentive is $70/m² for windows and walls, $8/m² for a roof with an attic space, $25/m² for other roofs (at most 15% of costs) and $8/m² of floor area covered by a blower-door test for air sealing (at most 75% of costs). The cap is $100,000 per fiscal year and per account; applications under $500 are refused. Natural gas must provide at least 30% of the heating energy, or the customer must be on dual energy. Above 2,000 m² renovated, savings are established by an engineer from a registered firm. The declaration of intent precedes the signing of the first contract.
Dual energy and decarbonization: how much per site?
The dual-energy incentive can reach $250,000 per site on the simplified path and $6,000,000 per site on the custom path. This program from Énergir and Hydro-Québec, supported by the Québec government under the 2030 Plan for a Green Economy, has been in force since April 1, 2026. For Énergir customers, it replaces the former commercial and institutional dual-energy component of ÉcoPerformance. The participation guide (revised June 18, 2026) provides for:
- Eligible buildings: commercial, institutional, mixed-use and residential buildings of 20 units or more, heated with natural gas for at least 12 months; buildings located on an industrial site are excluded, as are participants that are Québec government departments, budget-funded bodies or enterprises, or federal departments and agencies.
- Calculation: 80% × (estimated project cost − estimated baseline cost).
- Simplified path: preset incentive based on the equipment, capped at $250,000 per application and per site.
- Custom path: project plan signed by an OIQ engineer; incentive capped at $250 per tonne of CO₂ equivalent reduced over 10 years, at $3,000,000 per application and at $6,000,000 per site.
- Conditions: electricity as the main source and gas as backup; subscription to the dual-energy rate for at least ten years; application filed no later than 30 days after the start of work; work completed within 48 months of the incentive confirmation.
For the technical analysis of this choice, see our article on dual energy in commercial buildings and our decarbonization strategies. Renewable-source gas, for its part, is not a grant: the program list includes no incentive for purchasing renewable-source gas (RSG). It only comes into play as a condition, for example under the Implementation component (see above).
Innovation, solar preheating and low-income households
Three offers complete the inventory:
- Innovation: up to 75% of costs, maximum of $25,000 for an experimentation project and $250,000 for a demonstration project, if the innovative technology allows more efficient use of natural gas and is not eligible for any other Énergir program.
- Solar preheating: $3/m³ saved, up to $200,000 per account and 75% of eligible costs; application before the work.
- Supplement for low-income households: up to double the base grant for buildings of four or more units, depending on the proportion of low-income households; housing cooperatives automatically receive double. It applies in particular to studies, implementation, recommissioning, boiler systems, new construction and renovation.
Summary table of Énergir grants
The table summarizes the maximum incentive and the key condition of each program, according to the documents in force in October 2026.
| Program | Incentive | Cap | Key condition |
|---|---|---|---|
| Feasibility study | 50% of pre-tax cost | $50,000 per account and per year | Service offer accepted before the study |
| Implementation of efficient measures | $1/m³ saved (gas PBP of 1 to 20 years) | $1,000,000 per account and per year or 50% of incremental costs | Measures recommended by an engineer (OIQ) |
| Recommissioning (RCx) | 75% of costs per phase; $1/m³ at implementation | $100,000 per project | ≥ 75,000 m³/year; accredited agent |
| Boiler system optimization | Depends on the measure (BHP, boiler, sq. ft.) | $340,000 per boiler | Form I before the work |
| Steam traps | Audit 100%; measures 50% | $106,700 per maintenance | Steam produced > 50% with gas |
| EMS (industrial) | 75% of costs + $0.50/m³ | $1,175,000 | Site ≥ 2 Mm³/year |
| New efficient construction | $5/m³ saved | $325,000 per account | ≥ 5% better than NECB 2015-Qc; ≥ 15,000 m³ |
| Efficient renovation | $8 to $70/m² | $100,000 per year and per account | Declaration before the first contract |
| Unit heater / infrared | Depends on capacity / $800 | $4,500 / $800 per unit | Contract before installation |
| Variable-speed hood | $3,750 + $0.75/CFM | 75% of costs | Notice of intent before installation |
| Smart thermostat | $100 | 75% of cost | Application within 30 days |
| Solar preheating | $3/m³ saved | $200,000 per account | Application before the work |
| Innovation | 75% of costs | $25,000 / $250,000 | Not eligible elsewhere at Énergir |
| Dual energy, commercial and institutional | 80% of incremental costs | $250,000 (simplified); $6,000,000 per site (custom) | Application ≤ 30 days after the start of work |
| Low-income household supplement | Increase to the base grant | Up to double | Form I before the work |
Can you stack them with ÉcoPerformance and Hydro-Québec?
Yes, but with conditions: Énergir’s guides reduce the incentive so that the customer bears at least 25% of the costs, and several components explicitly exclude ÉcoPerformance. The official rules read as follows:
- Énergir’s general rule: under the Studies, Implementation, New Construction, Renovation, Solar Preheating and Recommissioning components, any incentive received from another distributor or a government body must be declared; Énergir reduces its own so that the customer’s share is at least 25% of costs.
- Studies: a study funded by ÉcoPerformance is not eligible at Énergir.
- Recommissioning: stacking is permitted with other organizations, except ÉcoPerformance, up to 75% of eligible costs. ÉcoPerformance’s RCx component, moreover, no longer accepts new applications since September 1, 2026.
- Dual energy: only stacking with Énergir, Hydro-Québec and the Québec government is authorized; the dual-energy component has been removed from ÉcoPerformance’s regulatory framework and is now managed by Énergir.
- EMS: no other incentive for the EMS, except Hydro-Québec’s in the harmonized version. For its part, ÉcoPerformance’s energy management component refuses sites that receive an energy distributor’s incentive for the same scope.
- ÉcoPerformance side: the regulatory framework in force since July 7, 2026 limits stacking of public incentives to 75% of expenses; the analysis component refuses stacking with Hydro-Québec, Énergir and Enbridge. See our article on the ÉcoPerformance program.
- Hydro-Québec side: according to the terms of the Solutions efficaces program (March 2026), Hydro-Québec may refuse or revise its incentive if the same project is submitted to a program from any other organization.
In practice, each measure must fall under a single program, and gas and electricity savings must be documented separately. Validate the allocation with each organization before filing.
How do you prepare an Énergir grant application?
A solid application is prepared before the first contract is signed, because most programs refuse work that has already been committed. The steps common to Énergir’s guides:
- Establish baseline consumption: 12-month history, share of gas in heating, account numbers concerned (one form can group up to 20 buildings for a study).
- Choose the right program: a measure covered by a prescriptive program or by the boiler systems program cannot be subsidized twice under Implementation.
- File the eligibility application at efficaciteenergetique@energir.com, with the service offer, the declaration of intent or the project plan depending on the component, then wait for written acceptance.
- Document the savings: calculations in Excel format and simulation files, carried out or verified by an OIQ engineer, with a defensible baseline scenario.
- Respect the deadlines: 6 months for a study, 1 year for an implementation, 3 years for new construction, 48 months for dual energy, counted from acceptance.
- Claim the payment: invoices, supporting documents and an invoice addressed to Énergir for the incentive amount, plus taxes; Énergir may inspect the installation.
How ORT Énergie can support you
ORT Énergie is an energy efficiency engineering consulting firm. For a project eligible for Énergir’s programs, we can step in at the technical stages: energy audit and measures study, energy simulation and modelling for new construction, recommissioning (RCx) and commissioning, implementation of an ISO 50001 energy management system, design of plans and specifications, and support in preparing financial assistance applications. Our team notably supported GEA Farm Technologies in Drummondville in implementing the ISO 50001 standard and developing a decarbonization plan.
Before filing, we verify with you the applicable program, the qualification requirements specific to each component (registered firm, accredited agent) and the stacking rules with other programs.
Conclusion
Énergir’s grants cover the whole chain of a gas project: study, implementation, recommissioning, new construction, renovation and conversion to dual energy. They share one feature: pre-approval. An application filed after the first contract, a measure already covered by another program or a poorly declared stacking is enough to lose the incentive. Check the guides in force, document the savings from the design stage and coordinate applications to Énergir, Hydro-Québec and ÉcoPerformance before committing to the work.
Frequently asked questions (FAQ)
Who is eligible for Énergir’s business grants?
Most programs are aimed at current or future Énergir customers in the commercial, institutional, industrial and multi-unit residential (four or more units) sectors. Some programs have their own thresholds: 75,000 m³ per year for recommissioning, 2 Mm³ per year and an industrial site for the EMS, 20 units or more for dual energy in a residential building. Natural gas must generally be the main heating source of the building concerned.
Do you need Énergir’s approval before starting the work?
Yes, in almost all programs. Depending on the component, you must file an eligibility application, a declaration of intent or a Form I before the work, or sign a contract with an Énergir representative before installation. For efficient renovation, the start of work corresponds to the signing of the first contract; for dual energy, the application must be filed no later than 30 days after the start of work.
What is the maximum Énergir grant for implementing measures?
The Implementation component pays $1 per cubic metre of natural gas saved in the first year, up to $1,000,000 per account number and per fiscal year or 50% of eligible incremental costs, whichever is lower. Measures with a payback period of less than one year and applications under $1,000 are not eligible.
Can you combine an Énergir grant and ÉcoPerformance?
Not for all measures. A study funded by ÉcoPerformance is not eligible at Énergir, Énergir’s recommissioning excludes stacking with ÉcoPerformance, and ÉcoPerformance’s analysis component refuses Énergir’s incentive. Where stacking is permitted, Énergir reduces its incentive so that the customer bears at least 25% of the costs.
Is commercial dual energy still part of ÉcoPerformance?
No. The commercial and institutional dual-energy component has been removed from ÉcoPerformance’s regulatory framework and is now managed by Énergir, whose program has been in force since April 1, 2026. The incentive covers 80% of incremental costs, up to $250,000 per site on the simplified path or $6,000,000 per site on the custom path.
Can Énergir’s programs change during the year?
Yes. Énergir states that its grants are subject to change without notice and that it may modify or end a program at any time; applications already accepted are nonetheless processed. Several terms were revised on February 25, 2026. Check the date of the participant guide before each filing.