LEED v5 is the new version of the U.S. Green Building Council (USGBC) green building certification system. Launched in April 2025, it will become the only version available for new registrations of commercial projects starting July 1, 2027. For developers, property managers and institutions in Québec, the change is concrete: decarbonization becomes the thread running through the system, electrification and embodied carbon enter the requirements, and the Platinum level now comes with specific conditions. Here is what is published and in force, what is only announced, and what it means for a Canadian project.

Information verified in October 2026 with the USGBC (LEED v5 BD+C, ID+C and O+M reference guides, July 2026 edition, the LEED v5 help centre, the certification deadlines page), the Canada Green Building Council (CAGBC) and GBCI.

What is LEED v5 and when was it launched?

LEED v5 was ratified by USGBC members on March 28, 2025 and launched in April 2025 for the BD+C, ID+C and O+M commercial rating systems. In Canada, projects have been able to register under LEED v5 since April 28, 2025, according to CAGBC.

The version went through two public comment periods in 2024 before ratification. The USGBC states that it is adopting a five-year development cycle to give the market more predictability. Reference documents are updated through addenda: at the time of writing, the most recent edition of the BD+C, ID+C and O+M reference guides published by the USGBC is the July 2026 edition.

A few administrative rules remain unchanged: according to the USGBC help centre, the LEED v5 Minimum Program Requirements (MPRs) are the same as those of LEED v4, and LEED v5 fees are the same as those of previous versions.

Which rating systems does LEED v5 cover?

LEED v5 currently covers three families of commercial rating systems: Building Design and Construction (BD+C), Interior Design and Construction (ID+C) and Operations and Maintenance (O+M). The variants open for registration are:

  • LEED v5 BD+C: New Construction — new buildings and major renovations;
  • LEED v5 BD+C: Core and Shell — shell and core projects whose tenant spaces will be fitted out later;
  • LEED v5 ID+C: Commercial Interiors — commercial interior fit-outs;
  • LEED v5 O+M: Existing Buildings — existing buildings in operation, including recertification.

Some approaches are not yet offered: the USGBC specifies that the campus, group and volume approaches are not yet available for LEED v5. For residential, a multifamily building of at least four storeys above grade can choose LEED v5 BD+C. A LEED v5 system for cities (LEED for Cities) is under development and has gone through two public comment periods, in 2025-2026: it is a version in development, not a system in force.

How is LEED v5 structured?

LEED v5 is organized around three impact areas — Decarbonization, Quality of Life, and Ecological Conservation and Restoration — and the USGBC specifies that every credit and every prerequisite is tied to at least one of these three areas.

  • Decarbonization: reducing operational, embodied, refrigerant and transportation emissions across the building’s life cycle;
  • Quality of Life: health, well-being, resilience and equity for occupants and communities;
  • Ecological Conservation and Restoration: limiting the degradation of natural environments and contributing to their restoration.

Like previous versions, LEED v5 combines prerequisites (mandatory, no points) and credits (optional, earning points). The BD+C system totals 110 points, spread across eight categories:

Category (LEED v5 BD+C)New ConstructionCore and Shell
Integrative Process, Planning and Assessments (IP)17
Location and Transportation (LT)1515
Sustainable Sites (SS)1111
Water Efficiency (WE)98
Energy and Atmosphere (EA)3327
Materials and Resources (MR)1821
Indoor Environmental Quality (EQ)1311
Project Priorities (PR)1010
Total110110

The IP category now groups several new prerequisites, including the Climate Resilience Assessment, the Human Impact Assessment and the Carbon Assessment. The O+M and ID+C systems also total 110 points, with their own prerequisites and credits.

Certification levels and Platinum requirements

The four certification levels and their point thresholds do not change with LEED v5, but the Platinum level now requires specific minimum performance in energy and carbon.

LevelPoints required
Certified40 to 49
Silver50 to 59
Gold60 to 79
Platinum80 and above, with additional requirements for v5 projects

These Platinum requirements are detailed in Appendix I of each reference guide:

Platinum requirementBD+C: New ConstructionBD+C: Core and ShellID+C
Electrification5 points in the Electrification credit (no on-site combustion, except emergency systems)4 points in the Electrification creditNo new on-site combustion equipment within the scope of work
Energy efficiency8 points in the Enhanced Energy Efficiency credit5 points in the Enhanced Energy Efficiency credit7 points in the Enhanced Energy Efficiency credit
Renewable energy100% of site energy (combination of tiers 1, 2 and 3)100% of base building energy100% of the tenant’s annual energy use
Embodied carbon20% reduction20% reduction10% reduction

In O+M, the Platinum level notably requires 7 points in the Optimized Energy Performance credit, at least 2 points under Option 1 and at least 2 points under Options 2 or 3 of the Greenhouse Gas Emissions Reduction Performance credit, and 2 points in the Decarbonization and Efficiency Plans credit.

Energy and carbon: what changes compared with LEED v4 and v4.1

The central change in LEED v5 is the shift from an energy-efficiency logic to a decarbonization logic: the USGBC describes the Energy and Atmosphere category as built around three steps, electrification, reduction of peak thermal loads and energy efficiency. The items below are drawn from the LEED v5 BD+C reference guide (July 2026 edition) and the summary of changes published by the USGBC.

Operational carbon projection and decarbonization plan (new prerequisite)

Prerequisite EAp1 (Operational Carbon Projection and Decarbonization Plan) requires analyzing efficiency, peak reduction and decarbonization measures from the earliest design stages. The team then submits to the USGBC an estimate of annual consumption by energy source; from this data, the USGBC generates a 25-year emissions projection under a business-as-usual scenario, which the owner must attest to having reviewed. Finally, the project must either earn 4 or 5 points in the Electrification credit, or produce a 25-year decarbonization plan (a narrative of two pages at most describing the planned retrofits, their timing and their approximate cost). The IP prerequisite Carbon Assessment complements this approach with a 25-year projection that also includes refrigerants and embodied carbon.

Minimum energy performance: ASHRAE 90.1-2019 or 2022

The Minimum Energy Efficiency prerequisite relies on ASHRAE 90.1-2019 (with addendum cr) or 90.1-2022. Projects registered before January 1, 2028 may choose either version; those registered on or after that date must use 90.1-2022. By way of comparison, LEED v4 BD+C relied on ASHRAE 90.1-2010 and LEED v4.1 on 90.1-2016, with a dual metric of cost and GHG emissions. In the performance path (Appendix G), LEED v5 introduces a “future source energy” metric that can replace cost; the guide specifies that a site-to-source electricity conversion factor of 2.0 is based on U.S. projections, and that a lower national average value may be used outside the United States.

Enhanced energy efficiency

The Enhanced Energy Efficiency credit (up to 10 points in New Construction, 7 in Core and Shell) replaces the Optimize Energy Performance credit, which was worth up to 18 points in LEED v4.1 BD+C New Construction. The USGBC indicates that several points were reallocated to the new electrification and peak thermal load reduction credits. Two options coexist: a prescriptive path (credits from section 11 of ASHRAE 90.1-2022 and measures on plug and process loads) and an energy simulation path. In simulation, 1 point is awarded for a 3% improvement in the performance index without on-site renewable generation, up to 10 points for 30%; the 8-point target required for Platinum in New Construction therefore corresponds to 24%.

Electrification (new credit)

The Electrification credit (up to 5 points in New Construction) rewards design without on-site combustion. Option 1 (5 points) excludes all on-site combustion, except emergency systems, with a weighted average coefficient of performance (COP) of at least 1.8 for space heating and domestic hot water. Option 2 (up to 4 points) allows combustion only at low temperatures, which the guide defines as an outdoor dry-bulb temperature below 20°F (−6.5°C). This option deserves a close look for the dual-energy systems common in Québec.

Peak loads and grid interaction

The new Reduce Peak Thermal Loads credit (up to 5 points) targets airtightness and balanced ventilation, ventilation energy recovery, thermal bridges and the reduction of peak thermal loads; envelope performance cannot be offset by other systems in this credit. The Grid Interactive credit (up to 2 points) incorporates the former demand response credit and adds energy storage and electrical resilience of critical systems. The metering prerequisite also requires reporting to the USGBC, for five years, monthly consumption by energy source and electrical peak demand.

Embodied carbon: from optional credit to prerequisite

The new prerequisite MRp2 (Quantify and Assess Embodied Carbon) requires all BD+C projects to quantify the “cradle-to-gate” global warming potential (stages A1 to A3) of the structure, the envelope and hardscape, and then to identify the three main sources of embodied carbon. The Reduce Embodied Carbon credit (up to 6 points in New Construction, 8 in Core and Shell) rewards reductions through whole-building life cycle assessment, through analysis of environmental product declarations (EPDs), or through tracking of construction site emissions.

Climate resilience and refrigerants

The Climate Resilience Assessment prerequisite requires an assessment of the site’s climate and natural hazards (extreme cold, winter storms, flooding, extreme heat, etc.) and the selection of at least two priority hazards to be addressed through design. On the refrigerant side, the basic prerequisite requires an inventory, prohibits HCFCs in new equipment and calls for evaluating alternatives for any refrigerant with a GWP above 700.

In operation (O+M): a certification based on measured performance

LEED v5 O+M evaluates actual performance over a 12-month reporting period. For property types eligible for an ENERGY STAR score in the United States and Canada, the minimum performance prerequisite requires a Portfolio Manager score of at least 60. Other types must meet energy intensity targets based on ASHRAE 100-2024 or demonstrate a reduction of at least 8% compared with a historical baseline year.

What is the timeline for the end of LEED v4 and v4.1?

Registrations for the LEED v4 and v4.1 commercial rating systems (BD+C, ID+C and O+M, including O+M recertification) close on June 30, 2027, and LEED v5 will be the only version offered for new commercial registrations starting July 1, 2027, subject to a few exceptions. CAGBC confirmed in May 2026 that these dates apply in Canada.

DateMilestoneStatus
March 28, 2025Ratification of LEED v5 by USGBC membersDone
April 28, 2025LEED v5 BD+C, ID+C and O+M registration opens in CanadaDone
June 30, 2027End of LEED v4 and v4.1 registrations (BD+C, ID+C, O+M)Published
July 1, 2027LEED v5 becomes the only version for new commercial registrationsPublished
January 1, 2028ASHRAE 90.1-2022 mandatory for new LEED v5 projects; end of the NECB 2020 path for new registrationsPublished
June 30, 2033Deadline to submit LEED v4 and v4.1 projects for certificationPublished

For projects under split review (design, then construction), the design review must be submitted by June 30, 2033 at the latest, and the construction review by December 31, 2034 at the latest. The residential systems and LEED v4 Neighbourhood Development remain open with no announced closing date. Detailed deadlines are on the USGBC deadlines page.

LEED v5 in Canada and Québec: the role of CAGBC and adaptations

In Canada, LEED v5 is administered by the Canada Green Building Council, which has provided direct oversight of LEED certification for Canadian projects since March 18, 2022, in collaboration with the USGBC and GBCI. LEED v5 registrations are made on the Arc platform, and CAGBC publishes Canadian documentation (fact sheets, regional compliance paths, webinars) on its LEED v5 resources page.

The NECB 2020 path: the most important Canadian adaptation

Since May 2026, the National Energy Code of Canada for Buildings (NECB) 2020 has been recognized as a Regional Alternative Compliance Path (RACP) in LEED v5 BD+C for the minimum performance prerequisite and the enhanced energy efficiency credit, in both New Construction and Core and Shell (RACP16 and RACP17). This path is optional: ASHRAE 90.1-2019 remains permitted. According to CAGBC, it applies only to new construction (major renovations must use ASHRAE 90.1), it is reserved for projects registered before January 1, 2028, it includes an envelope safeguard that limits trade-offs, and no equivalent path is planned for ID+C.

What is published and what is announced

Canadian itemStatus (October 2026)
NECB 2020 path (RACP16 and RACP17) for BD+CPublished (May 2026)
RACP1 (prime agricultural land) and RACP15 (bird-friendly design, CSA A460)Published (February 2026 addendum)
Pilot electrification compliance path for district energy systems (BD+C, then O+M)Published (February and July 2026 addenda)
Reference to the NRC whole-building LCA guidePublished (July 2026 addendum)
NECB 2025 path, aligned with ASHRAE 90.1-2022Announced, not published
Other Canadian regional pathsAnnounced by CAGBC for release throughout 2026

The Québec context

Québec earned the first LEED v5 certification in Canada: the FSFTQ – Édifice Louis-Laberge project achieved Platinum under the LEED v5 O+M beta program, according to CAGBC. In November 2025, following a summit held in Montréal with Bâtiment durable Québec, CAGBC also highlighted that Québec’s clean electricity grid allows projects to focus their efforts on embodied carbon and energy optimization. In other words, when electricity is low in carbon, embodied carbon weighs relatively more heavily in the carbon footprint of an electrified project. To explore these ideas further, see our articles on sustainable building and decarbonization strategies.

What role does energy modelling play in LEED v5?

Energy modelling comes in earlier and at more stages in LEED v5, even though it is not strictly mandatory for every prerequisite. It comes into play at four points:

  • At schematic design (EAp1): the analysis of efficiency, peak and decarbonization measures can rely on simplified energy modelling, on similar projects or on published data; the consumption estimate by source feeds the 25-year carbon projection.
  • For minimum compliance (EAp2): the prescriptive paths of ASHRAE 90.1 remain permitted, but the performance path (Appendix G) or the NECB 2020 path in Canada requires a simulation.
  • For points (EAc3 and EAc2): the simulation option of the enhanced efficiency credit provides access to the 10 points in New Construction, and the peak load reduction credit includes an energy simulation pathway.
  • For electrification (EAc1): the weighted average COP can be determined from rated efficiencies or from an annual average COP calculated by simulation.

The change in metric (future source energy rather than cost) and the dual requirement for electrification and peak reduction change design trade-offs: energy modelling done early makes it possible to compare them before the envelope and systems are locked in.

How ORT Énergie can help

ORT Énergie is an energy efficiency consulting engineering firm whose founder, Massi Ourtirane, Eng., M.Eng., holds the LEED AP BD+C (Building Design and Construction) credential. For a LEED v5 project, we can contribute on the energy aspects:

  • Energy simulation and modelling: schematic design analyses for EAp1, modelling according to ASHRAE 90.1 or the NECB 2020 path, comparison of electrification and peak load reduction scenarios;
  • Commissioning of systems, in connection with the commissioning prerequisites and credits;
  • Peak demand management and geothermal, for electrification and grid interaction strategies;
  • Existing buildings (O+M): energy audit, recommissioning (RCx) and an ISO 50001 energy management system to improve measured performance;
  • Support with financial assistance applications related to energy efficiency and energy conversion measures.

Choosing the target certification level, trading off between credits and coordinating the LEED submission are done with the entire project team; our role is the rigour of the energy analyses that feed them.

Frequently asked questions (FAQ)

When did LEED v5 come into force?

LEED v5 was ratified by USGBC members on March 28, 2025 and launched in April 2025 for the BD+C, ID+C and O+M systems. In Canada, projects have been able to register under LEED v5 since April 28, 2025. LEED v5 will become the only version offered for new commercial project registrations starting July 1, 2027.

Can a project still be registered under LEED v4.1 in Canada?

Yes, until June 30, 2027 for the BD+C, ID+C and O+M commercial systems, including O+M recertification. CAGBC has confirmed that these dates apply in Canada. Registered projects must then be submitted for certification by June 30, 2033 at the latest.

How many points are needed to earn LEED v5 certification?

The thresholds are 40 to 49 points for Certified, 50 to 59 for Silver, 60 to 79 for Gold and 80 points and above for Platinum, out of 110 possible points. For LEED v5, the Platinum level additionally requires minimum results in electrification, energy efficiency, renewable energy and embodied carbon reduction. In BD+C New Construction, this notably means no on-site combustion and a 20% reduction in embodied carbon.

Can the NECB be used instead of ASHRAE 90.1 for LEED v5 in Canada?

Yes, for LEED v5 BD+C: since May 2026, the NECB 2020 has been recognized as a regional compliance path for the minimum energy performance prerequisite and the enhanced energy efficiency credit. This path is optional, reserved for new construction and for projects registered before January 1, 2028. An NECB 2025 path has been announced by CAGBC but is not yet published.

Is energy modelling mandatory in LEED v5?

Not in every case: the carbon projection prerequisite accepts simplified modelling, similar projects or published data, and prescriptive paths exist for minimum performance and for the enhanced efficiency credit. Simulation is nevertheless required for the ASHRAE 90.1 performance path (Appendix G), for the NECB 2020 path and to access the simulation option of the efficiency credit, worth up to 10 points in New Construction.

Can a building heated with natural gas be LEED v5 certified?

Yes, electrification is a credit, not a prerequisite, but a project that does not earn 4 or 5 points in the electrification credit must produce a 25-year decarbonization plan. Combustion limited to low temperatures, below −6.5°C, can earn some of the points. The Platinum level in New Construction, however, requires no on-site combustion except for emergency systems.

Who issues LEED certification in Canada?

The Canada Green Building Council has provided direct oversight of LEED certification for Canadian projects since March 2022, in collaboration with the USGBC, which develops the system, and GBCI. LEED v5 projects register on the Arc platform. CAGBC also publishes Canada-specific compliance paths, such as the NECB 2020 path.