Since 2022, owners of large buildings in Montréal have had to report their building’s energy consumption to the City every year under By-law 21-042, the by-law concerning greenhouse gas emission disclosures and ratings of large buildings. Since September 2025, the by-law has also contained the method that will be used to assign a GHG rating to each building. And in June 2026, Québec enacted its own mandatory disclosure, which will apply starting in 2027. Here is what the official texts actually require, and how to use ENERGY STAR Portfolio Manager to comply.

Information verified in October 2026 with the City of Montréal (by-law text, administrative consolidation as of September 23, 2025, Ordinance No. 1, detailed guide and August 2026 Questions and Answers), Natural Resources Canada, Hydro-Québec, the Gazette officielle du Québec and Québec.ca. The official by-law text takes precedence over any summary, including this one.

What is By-law 21-042?

By-law 21-042 is a municipal by-law that requires owners of large Montréal buildings to disclose each year the GHG emissions generated by their building’s energy consumption. It was adopted by city council on September 27, 2021 and came into force on October 4, 2021, following the City’s 2020-2030 Climate Plan.

Section 1 gives it three objectives: improving the City’s knowledge of these emissions, comparing them, in particular by assigning a rating, and enabling the City to develop measures to reduce them. The City presents it as the first step in a three-stage system: disclosure, then rating, then performance, meaning the achievement of standards by set dates.

It is important to be clear about what it requires today. In its August 2026 Questions and Answers, the City answers no to the question of whether the by-law requires improvements, audits or renovations. At this stage, it is a disclosure requirement.

The emissions covered are CO2, CH4 and N2O attributable to the building’s energy consumption: on-site combustion and consumption of electricity, steam, hot water or chilled water from a network. Industrial process emissions and fluorinated gases (HFCs, PFCs, SF6, NF3) are excluded.

Which buildings are covered?

Since January 1, 2024, the by-law applies to every existing building with 2,000 m² or more of floor area or 25 or more dwellings, located within the City of Montréal, in the commercial, institutional and residential sectors. Coverage was phased in over three waves:

Covered startingBuildings covered (section 3)First disclosure
January 1, 2022Buildings of 15,000 m² or more that are not exclusively residential; buildings of 2,000 m² or more owned by the CityJune 30, 2022 (2021 data)
January 1, 2023Buildings of 5,000 m² or more; buildings with 50 or more dwellingsJune 30, 2023 (2022 data)
January 1, 2024Buildings of 2,000 m² or more; buildings with 25 or more dwellings; any other building designated by executive committee ordinanceJune 30, 2024 (2023 data)

Floor area is measured from the outer face of the exterior walls and includes all common areas, but excludes interior parking, outdoor or not fully enclosed spaces and crawl spaces. For a semi-detached or contiguous building, the property line stands in for the exterior wall. The City specifies that this calculation may differ from the area shown on the property assessment roll.

Exceptions and special cases

  • A building included in an assessment unit whose predominant use on the property assessment roll includes an industry is not covered.
  • The owner does not have to disclose the consumption of a building occupied in whole or in part by a business or establishment subject to section 6.1 of the Règlement sur la déclaration obligatoire de certaines émissions de contaminants dans l’atmosphère (Regulation respecting mandatory reporting of certain emissions of contaminants into the atmosphere) (CQLR, c. Q-2, r. 15).
  • A new building becomes subject to the by-law as soon as it is put into service; according to the City, reporting begins with the calendar year following commissioning, so as to cover a full year.

The City publishes a list of covered buildings that assigns each one an “Identifiant standard Montréal - Divulgation” (the building ID, the City’s standard identifier for disclosure). Note that this list is based on preliminary data, and a building’s presence or absence on it does not exempt anyone from complying with the by-law.

What data must be reported, and by when?

The owner must submit to the City, by June 30 of each year at the latest, the information in Schedule A of the by-law for the period from January 1 to December 31 of the previous year. In practice, the disclosure includes:

  • the identification of the owner and, for a legal person, a partnership or a co-ownership, the individual responsible for the disclosure;
  • the address, year of construction, floor area, number of dwellings (residential or mixed-use building) and the City’s building ID;
  • each type of use of the building, chosen from the Schedule A list, with its area;
  • for electricity, natural gas, steam, hot water and chilled water from a district thermal network: the quantities per billing period and their cost;
  • for kerosene, fuel oil, diesel, propane, coal, coke and wood: the delivery date, the quantity received and the cost of each delivery;
  • the electrical power demand (kW) per billing period and, where applicable, the name of the district thermal network supplier.

The City’s Questions and Answers add a few useful details: disclosure is limited to three types of use per building, a type representing less than 10% of the total area does not have to be reported separately (its area is combined with a reported type), and the reported cost includes all related charges and taxes.

Who is responsible?

The owner, or the syndicate in the case of a divided co-ownership, is responsible for reporting the building’s complete consumption, including that of tenants or co-owners. If the building changes owners during the year, the new owner files that year’s disclosure. Each building is disclosed separately, unless several buildings are linked to a single meter.

When tenant data is missing, the City asks that a disclosure with all available data still be submitted before the deadline, that a note be added in Portfolio Manager, and that you write to the City stating the number of missing meters, the corresponding area and the type of energy. It warns that partial data could negatively affect the rating.

Does the data have to be verified by a third party?

No: By-law 21-042, in its current version, does not require any third-party verification of the data, at any frequency. Instead, sections 12 to 14 give the City inspection and verification powers:

  • the competent authority may visit, examine, measure and photograph any covered building;
  • it may require, by written notice, any document that allows the accuracy of the information to be verified, which must be provided within 60 days;
  • the owner must keep for five years any document that can confirm a reported item of information.

The City strongly encourages an internal or external verification of the data before submission, and announces spot checks as well as in-depth verifications when the data does not match the reported type of use. An error discovered after the fact must be reported to the City by email, then corrected and resubmitted.

Mandatory verification by a professional, at least once every four-year period, does exist, but in the new provincial regulation, not in the Montréal by-law. The confusion is common.

How does Montréal’s GHG rating work?

Montréal’s GHG rating compares a building’s emissions intensity, in kg CO2e/m²·yr, with the average of Montréal buildings of the same type of use. Its calculation method was added to the by-law (Schedule C) by executive committee Ordinance No. 1, adopted on September 17, 2025 and in force since September 23, 2025.

The method in brief

  1. Annual consumption by energy source (GJ/yr) is normalized using Montréal heating degree-days.
  2. It is converted into GHG emissions using the emission factors published by the Québec government in its Table des facteurs de conversion et d’émission pour les bâtiments et les véhicules (table of conversion and emission factors for buildings and vehicles).
  3. Emissions are divided by floor area to obtain the building’s performance, which is then compared with the tiers for its type of use. For a multi-use building, the tiers are weighted in proportion to the area of each type.

The tiers for each type of use were established from the complete data received during the June 30, 2025 disclosure period. The reference average is calculated on buildings with at least 90% of their area associated with the type in question.

RatingThreshold set out in Schedule COfficial description (our translation)
AAAZero operational carbon (0 kg CO2e/m²·yr)Zero operational carbon
AATier C / 4 x 40%Very low emissions
ATier C / 4 x 80%Low emissions
BTier C / 4 x 120%Lower than average
CAverage performance for the type of useAverage emissions
DTier C + (Tier C) / 4 x 200%Higher than average emissions
ETier D + (Tier C) / 4 x 240%High emissions
FNo maximum valueVery high emissions
R—Building that has not submitted the required information
N—Not applicable (for example: a unique building with no comparable, a vacant building with a demolition permit, a building under construction)

Two practical consequences: a building whose disclosure is missing or incomplete at the deadline receives an R rating, and the rating depends directly on the energy sources used, since it is based on emissions rather than consumption.

Transmission, publication and posting

The by-law provides that the City sends each owner the rating resulting from their latest disclosure and publishes on its website the address and rating of each covered building. Section 10 requires the owner to post the rating within 30 days of receiving it, in accordance with the posting standards set out in the by-law. However, the administrative consolidation as of September 23, 2025 contains no posting standards, which the executive committee may set by ordinance. To date, the City has not published a date for sending the first ratings.

What are the penalties?

Anyone who contravenes the by-law commits an offence punishable by a fixed fine, which increases for repeat offences (section 15):

OffenderFirst offenceFirst repeat offenceFurther repeat offence
Individual$500$1,000$2,000
Legal person$1,000$2,000$4,000

The City specifies that an offence is committed if the report is not submitted before the deadline or if the disclosure is partial. Beyond the fine, failure to report now results in an R rating.

What has changed since 2021?

By-law 21-042 has been amended only once since its adoption: by executive committee Ordinance No. 1 (CE/21-042 (001)), in force on September 23, 2025. The City’s municipal by-law directory lists no other amending by-law or ordinance, and the most recent administrative consolidation is dated September 23, 2025. This ordinance:

  • adds the definition of “heating degree-day”;
  • adds Schedule C, which sets out the rating calculation method;
  • adds the City’s building ID to the information to be disclosed;
  • replaces section 1 of Schedule B (disclosure procedures): disclosure is now made through the disclosure link provided on the by-law page, whereas the 2021 version also mentioned the City’s form.

Comparing the 2021 text with the consolidation as of September 23, 2025 shows that the ordinance adds no new obligation beyond the annual disclosure, other than listing the building ID among the information to be provided. The area thresholds, the June 30 date and the fines are unchanged since 2021.

Toward zero-emission buildings: what is adopted and what is announced

Montréal has set itself a roadmap to decarbonize buildings by 2040, but only part of that plan is regulated today. The obligations in force must be clearly distinguished from the announced intentions.

MeasureStatus as of October 2026
Annual disclosure of large buildings’ consumption (By-law 21-042)Adopted, in force
GHG rating calculation method (Ordinance No. 1)Adopted, in force since September 23, 2025
Ban on GHG-emitting combustion appliances in new buildings (By-law 23-046)Adopted on December 18, 2023; applies to new buildings whose building permit application was filed since October 1, 2024 (small buildings) or April 1, 2025 (other buildings)
Standards for posting the rating at the entrance of large buildingsAnnounced in the roadmap, not adopted
Mandatory disclosure of fuel-fired heating appliances (fuel oil, gas) for all buildingsAnnounced, not adopted
Progressively restricted GHG emission levels for buildings of 2,000 m² or more, down to zero carbon in 2040Announced, not adopted; no numerical threshold published

By-law 23-046 does not affect existing buildings. It prohibits, in new residential, commercial and institutional construction, appliances that emit GHGs through combustion for space and water heating, cooking and drying, with exceptions, notably for renewable-source gas in large buildings.

One point of caution: the roadmap describes a rating running from A to F, where A corresponds to zero carbon, whereas the scale adopted in the ordinance runs from AAA to F, with zero operational carbon corresponding to AAA. For any decision, the regulatory text prevails. To prepare for what comes next, see our articles on decarbonization strategies and carbon neutrality.

How do you report with ENERGY STAR Portfolio Manager?

Reporting under By-law 21-042 is done by responding, in ENERGY STAR Portfolio Manager (ESPM), to the City of Montréal’s annual “data request”, whose link is updated early each year on the by-law page. Owners without an account can also ask the City for the form it provides.

ESPM in Canada: a free tool administered by NRCan

Portfolio Manager is a free online energy benchmarking tool. The ENERGY STAR and Portfolio Manager marks are owned by the U.S. Environmental Protection Agency; in Canada, their administration and promotion fall to Natural Resources Canada (NRCan). According to NRCan, the tool is bilingual and has been adapted to account for Canadian weather, postal codes, the metric system and Canada-specific data.

The City’s five steps

  1. Create an ESPM account. The City recommends a generic email address, to make the handover easier if the person in charge changes.
  2. Create the property. Property type, address, year of construction, total area in m², area by type of use and the Montréal building ID. The sum of the areas by use must exactly match the gross area.
  3. Create the meters. The number of electricity meters must match the number of Hydro-Québec aggregation codes, plus any other meters under your management.
  4. Activate automatic data exchange. Hydro-Québec sends the data to ESPM once authorization has been given in the Espace client (customer portal); the identification token and, if applicable, the aggregation code must be entered in ESPM. For Énergir, you need the account number, the invoice number and the metering device number. According to the City, automatic transfer retrieves a 36-month history for Hydro-Québec and a 24-month history for Énergir.
  5. Transfer the information to the City. Run ESPM’s data quality checker as of December 31 of the year covered, respond to the year’s data request, generate the preview, sign electronically and submit. The email titled “Accusé de réception de l’envoi d’une demande de données” (acknowledgment of receipt of a data request) is your proof of disclosure: keep it.

Buildings with multiple meters deserve particular attention. Hydro-Québec offers an aggregation code that sends the consumption of all occupants in aggregated form, but only if the building has at least 10 meters associated with the same type of use (residential or commercial). Below that, you must get each tenant’s cooperation. Ideally, this is settled well before June.

ENERGY STAR score and GHG rating: two different things

Do not confuse the two. The ENERGY STAR score, from 1 to 100, calculated by ESPM for certain building types, places a building’s energy performance relative to similar buildings in Canada: 50 is the median and 75 or higher indicates superior performance. It is based on source energy. Montréal’s GHG rating, on the other hand, is calculated by the City from emissions per square metre. A fully electric building can earn a good GHG rating with an average ENERGY STAR score, and vice versa. An ENERGY STAR score of 75 or higher also opens the way to ENERGY STAR certification from NRCan, issued annually after verification by a licensed professional.

Is there an equivalent requirement in Québec?

Yes: the Règlement sur la déclaration obligatoire de la performance environnementale de certains bâtiments (regulation on the mandatory disclosure of the environmental performance of certain buildings) was enacted by Québec’s Minister of the Environment on June 9, 2026 and published in the Gazette officielle du Québec on June 23, 2026. It stems from the Loi sur la performance environnementale des bâtiments (act respecting the environmental performance of buildings) (CQLR, c. P-9.02) and will apply throughout Québec, including Montréal.

ItemMontréal (By-law 21-042)Québec (provincial regulation)
Buildings covered2,000 m² or more or 25 dwellings or more, since 2024From January 1, 2027: buildings of public bodies (except municipal bodies and certain buildings under 100 m²), non-exclusively residential buildings of 5,000 m² or more, buildings with 50 dwellings or more. From January 1, 2028: non-exclusively residential buildings of 2,000 m² or more, buildings with 25 dwellings or more
DeadlineJune 30, previous year’s dataJune 30; first disclosure by June 30, 2027 at the latest (buildings covered from 2027) or June 30, 2028 (buildings covered from 2028), with data for the two preceding calendar years
ToolData request in ESPMMinistry platform, announced for early 2027; ESPM and Hélios presented as compatible
Third-party verificationNot requiredAt least once every four-year period, report attached to the disclosure
Document retention5 years7 years
PenaltiesFines of $500 to $4,000Administrative monetary penalties of $250 to $5,000; penal fines of up to $1,500,000 (failure to disclose or to have the disclosure verified) and $3,000,000 (false or incomplete information) for a legal person

The provincial verification must be carried out by a member of one of these professional orders: chartered administrators, architects, chartered professional accountants, certified appraisers, engineers or professional technologists. It cannot be done by the owner, or by the person the owner has designated to prepare the disclosure. The regulation also requires Hydro-Québec and natural gas distributors to offer, by December 31, 2026 at the latest, a platform for transferring consumption data to covered owners.

For a Montréal building, the two regimes overlap. The exclusions provided in section 1 of the provincial regulation do not apply to buildings already reported to the City, and we found no official source announcing a one-stop shop between the City and the ministry. The City does indicate, however, that it has worked with the ministry to harmonize the processes. Finally, the Loi P-9.02 allows the government to establish, by regulation, an environmental performance rating and performance standards, but as of August 26, 2026, no draft regulation of this type appeared on the list of draft regulations published in the Gazette officielle that the ministry maintains.

How ORT Énergie can help

The annual disclosure is only a starting point: the data you submit to the City already serves to position your building against its peers, and both the City and Québec have announced what comes next. ORT Énergie, an energy efficiency consulting engineering firm, steps in downstream of the disclosure:

  • analysis of your consumption data and an energy assessment, to understand what determines your emissions intensity;
  • energy audit and recommissioning (RCx), to target operational and capital measures;
  • decarbonization plan, conversion studies (including geothermal) and peak demand management;
  • ISO 50001 energy management system, to structure the tracking of a property portfolio;
  • support with financial assistance applications, such as the ÉcoPerformance program.

Conclusion

As of October 2026, By-law 21-042 remains a disclosure requirement: the previous year’s data by June 30 at the latest, in Portfolio Manager, with no mandatory third-party verification. But two changes alter what is at stake. Since September 2025, the rating method has been written into the by-law, and a missing or incomplete disclosure earns an R rating. Starting in 2027, the provincial disclosure will add professional verification every four years and much heavier penalties. Owners who make their ESPM data reliable now and read their emissions intensity as a management indicator will be best positioned when the announced performance thresholds are adopted.

Frequently asked questions (FAQ)

Is my building covered by By-law 21-042?

It is if it is located within the City of Montréal and has 2,000 m² or more of floor area, or 25 or more dwellings, subject to exceptions (predominant industrial use on the roll, an establishment covered by the provincial atmospheric contaminants reporting). Check the list of covered buildings published by the City to obtain your building ID. The absence of your building from that list does not exempt you from reporting.

What is the disclosure deadline?

The disclosure must be submitted by June 30 of each year at the latest and cover consumption from January 1 to December 31 of the previous year. The 2026 data must therefore be submitted by June 30, 2027 at the latest. A partial disclosure must still be sent on time, accompanied by explanations to the City.

Do I need to have my data verified by an engineer or another third party?

Not under By-law 21-042: it does not require any third-party verification, but the City can request documents and carries out its own checks. Verification at least once every four years by a member of a professional order is a requirement of the provincial regulation that will apply starting in 2027. It cannot be carried out by the person who prepared the disclosure.

Does ENERGY STAR Portfolio Manager cost anything?

No. Portfolio Manager is a free online tool, administered in Canada by Natural Resources Canada. It is bilingual and adapted to Canadian data. Hydro-Québec and Énergir can automatically transfer your consumption data to it once authorization has been given.

Is the ENERGY STAR score the same as Montréal’s GHG rating?

No. The ENERGY STAR score (1 to 100) compares a building’s energy performance with that of similar buildings in Canada and exists only for certain building types. Montréal’s GHG rating (AAA to F) is calculated by the City from GHG emissions per square metre, compared with Montréal buildings of the same type of use.

What is the penalty for not reporting?

A $1,000 fine for a legal person on the first offence, rising to $2,000 and then $4,000 for repeat offences ($500, $1,000 and $2,000 for an individual). The building also receives the R rating, reserved for buildings that have not submitted the required information, and the City publishes the address and rating of covered buildings.

Will Montréal owners also have to report to Québec?

The provincial regulation provides no exclusion for buildings already reported to Montréal. A Montréal building that meets the provincial thresholds will therefore, as the texts stand, also have to report on the ministry’s platform starting in 2027 or 2028 depending on its category. Watch for announcements from the City and the ministry about possible harmonization of submissions.